Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0253

253-21.jpg
253-2110 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 753.
253-22.jpg
253-229 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 753.
253-23.jpg
253-239 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 753.
253-24.jpg
253-2411 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 753.
253-25.jpg
253-2510 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 755.
253-26.jpg
253-2610 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 755.
253-27.jpg
253-2710 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 757.
253-28.jpg
253-289 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggons, coupling of CHRY 755 and CHRY 757.
253-29.jpg
253-2911 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 754.
253-30.jpg
253-3012 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 746.
253-31.jpg
253-3114 viewsNelson Point yard sees BHP dumper pilot locomotive 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation.
253-32.jpg
253-3211 viewsNelson Point yard sees BHP dumper pilot locomotives 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation, and in the background with compressor set #2 is 5633 which was a new build CM39-8 GE model by Goninan. A sharp eye will notice the difference in the fuel tanks of the two locomotives.
253-33.jpg
253-3311 viewsNelson Point yard sees BHP dumper pilot locomotive 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation.
253-34.jpg
253-3422 viewsNelson Point hard stand area, riveted flat waggon 202 with three water tanks fitted, view of handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
253-35.jpg
253-3510 viewsNelson Point hard stand area, riveted flat waggon 202 with three water tanks fitted, side profile view, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
253-36.jpg
253-369 viewsNelson Point hard stand area, riveted flat waggon 202 with three water tanks fitted, view of handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
253-37.jpg
253-3713 viewsNelson Point hard stand area, riveted flat waggon 202 with three water tanks fitted, view of handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
     
37 files on 2 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional