Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Western Australian Negative and Digital Albums > 0202

Most viewed - 0202
202-03.jpg
202-03190 viewsMeckering, looking east along the goods siding with the good shed loop points, shed and crane in the distance.
202-07.jpg
202-07183 viewsMeckering, looking east, the points for the crossing loop with dual control point machine and relay interlocking room which houses the backup power plant, silos in the distance.
202-02.jpg
202-02181 viewsMeckering, view across standard gauge tracks at the original standard gauge brick station - waiting shelter.
202-17.jpg
202-17180 viewsMeckering, looking east, the three loadout spouts for the concrete grain silos, DRIFT sign to indicate the grade when loading waggons, station at right and goods shed visible beyond the loadout.
202-10.jpg
202-10179 viewsMeckering, former narrow gauge bridge located south of the standard gauge line.
202-05.jpg
202-05178 viewsMeckering, looking west towards Grass Valley and Perth, the Up departure CTC signals, 2 LA for the main and 2 LB for the loop.
202-08.jpg
202-08178 viewsMeckering, relay interlocking room, exhaust can be seen through wall, door is marked for Telephone, Crankhandle and Pilot Key.
202-06.jpg
202-06176 viewsMeckering, looking east at the Down arrival signal mast, 2 RA and 2 RB, relay room and grain silos in the distance.
202-12.jpg
202-12176 viewsMeckering, looking east at the interlocking levers #1 and #2 and Pilot Key box 5A for the goods siding and derail at the west end of the crossing loop.
202-09.jpg
202-09174 viewsMeckering, looking east with the mainline on the right and the crossing loop on the left and the back of Up departure signals, 2 RA on the right and 2 RB on the left.
202-16.jpg
202-16172 viewsMeckering, looking east, grain elevator with loadout dual overhead bunker bins with #1 closet to camera, the goods loop is running to the right of the loadout bin.
202-11.jpg
202-11171 viewsMeckering, interlocking arrangement for the grain siding, west end points off the crossing loop.
202-04.jpg
202-04169 viewsMeckering, looking east on the crossing loop, goods shed and sidings at left, station building at right.
202-13.jpg
202-13168 viewsMeckering, overview of the interlocking ground frame, 5A Pilot Key and associated rodding and infrastructure for the west end of the goods siding.
202-15.jpg
202-15165 viewsMeckering, looking east with the points for the hand operated non-interlocked points for the goods loop, grain siding continues on the left skirting the bunker and heading under the silo loading spout, while the goods loop bypasses the silos.
202-21.jpg
202-21161 viewsMeckering, view of the goods shed from the south east end, shows loading platform, ramps and crane.
202-14.jpg
202-14160 viewsMeckering, view looing east at the catch points and dwarf indicator at the west end of the goods siding, grain bunker and silos with the goods shed and station visible in the distance.
202-19.jpg
202-19158 viewsMeckering, looking east with the grain siding joining the goods loop, then with the goods siding branching off to the left, goods shed and crane on the left, station just visible on the right.
202-20.jpg
202-20157 viewsMeckering, view of the goods shed from the north east end, shows loading dock and ramps.
202-18.jpg
202-18152 viewsMeckering, looking west along the grain siding, capstan winch for assisting in moving grain waggons, the three loadout spouts for the concrete grain silos with the two overhead bunker loadouts visible beyond them.
32 files on 2 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional