Most viewed - 0220 |
220-05135 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking west past the Yard Limit sign and the 137.5 km grade crossing.
|
|
220-16133 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|
220-01126 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking east from the 135 km post.
|
|
220-02125 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking east past the point indicators and the 136 km post.
|
|
220-15120 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|
220-08118 viewsRubin Junction looking north from the Nimingarra Mine end of the triangle, the track to the left leads to Yarrie and the track to the right to Hedland.
|
|
220-07117 viewsRubin Junction looking west from the eastern end, the line off to the right is the line to Nimingarra Mine with the straight continuing onto Hedland.
|
|
220-11117 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, looking towards Yarrie.
|
|
220-14117 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|
220-03115 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking west at the points, indicator and shelter located at the 136 km or Hedland end.
|
|
220-19114 viewsTomlinson Steel WA built bottom discharge ore waggon 8115 loaded in the consist of a Yarrie train.
|
|
220-09111 viewsHills around former Shay Gap mining area.
|
|
220-17111 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|
220-06110 viewsRubin Junction looking east from the western end, the line off to the left is the line to Nimingarra Mine with the straight continuing onto Yarrie.
|
|
220-04109 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking west from the eastern end of the siding.
|
|
220-10109 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, looking towards Hedland.
|
|
220-13108 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|
220-18107 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|
220-12106 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, hills, Toyota HJ75 Landcruiser.
|
|
220-20102 viewsGoldsworthy Junction, looking north east along the Goldsworthy line as a loaded train ex Yarrie mine approaches rounding the curve, the grease pot for the curve behind the photographer is visible.
|
|
|