Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
207-25.jpg
207-25215 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M unit 5513 serial 4839-02 / 88-078, with 'Kalgan' nameboards removed for fitting to AC6000 class 6074, holds the main with a loaded Yarrie train awaiting a cross.
219-09.jpg
219-09214 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine unit General Electric Dash 9-44CW model 7089 serial 47768 idles away waiting the next loaded train to push out.
219-30.jpg
219-30214 viewsGoldsworthy Siding, C36-7M unit 5507 'Nimingarra' serial 4839-03 / 87-072, an original Mt Newman Mining ALCo C636 5461 to GE C36-7M rebuild carried out by Goninan, leads an empty train along the siding at Goldsworthy to cross a loaded.
180616_1810.jpg
180616 1810214 viewsEmu Siding, an empty train from Cape Lambert powers upgrade away from Emu Siding up the 1.6 percent grade behind Rio Tinto loco 8149 with serial 58730 a GE Erie built GE model ES44DCi from the 3rd order in Rio Tinto Stripes livery and 8193 with Dash 9-44CW unit 7089 with a consist of S and C type waggons. 16th June 2018. GeoData.
196-07.jpg
196-07213 viewsYandi Two, BHP Iron Ore 5630 'Zeus' serial 5831-09 / 88-079 originally built new by Goninan as a GE CM39-8 in 1988. Drivers side cab view shows hand brake chain and bogie. May 1998.
207-14.jpg
207-14213 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit, view of the left hand side cab and steerable bogie.
150505_7944.jpg
150505 7944213 viewsFMG Solomon Line, looking west, earth fill abutment embankment for rail line, Jingarri Creek, view from the western side, expanded view from 7942, access road visible at left. Geodata: -22.0525633 118.7199633 .
150505_7950.jpg
150505 7950213 viewsFMG Solomon Line, looking west along elevated section of track, repeater tower in distance. Geodata: -22.0398833 118.6280733 .
150505_7959.jpg
150505 7959213 viewsFMG Solomon Line, a pair of General Electric Dash 9-44CW locomotives 005 serial 58182 and 006 serial 58183 struggle upgrade with a loaded train at the 227 km bound for Port Hedland, the train is being assisted in the rear. Geodata: -22.0189283 118.5861050 .
1051_001.jpg
1051 001213 viewsWelshpool, Goninan Open Day 27th August, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079 out the front of the workshop on display.
Jim Bisdee photo.
150522_8165.jpg
150522 8165212 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 and 5647 serial 8244-12/92-136 were a pair of new Goninan WA CM40-8 model built in 1992.
219-34.jpg
219-34211 viewsGoldsworthy Siding, a loaded train powers along the mainline behind BHP C36-7M unit 5513 'Kalgan' serial 4839-02 / 88-078, an original Mt Newman Mining ALCo C636 5453 to GE C36-7M rebuild carried out by Goninan.
160128_00882.jpg
160128 00882211 viewsWedgefield, Sims Metal Yard, view looking at the inside of the cab front wall and the ALCo Hi-Ad bogie shows the external coil secondary suspension.
16948.jpg
16948211 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5480 serial G6061-1 being prepped for rebuilding into 5658. October 1993.
Jim Bisdee photo.
180616_1830.jpg
180616 1830211 viewsEmu Siding, an empty train from Cape Lambert powers upgrade away from Emu Siding up the 1.6 percent grade behind triple General Electric ES44DCi units Rio Tinto loco 8112 with serial 59104 a GE Erie built GE model ES44DCi from the 2nd order in Rio Tinto livery and 8162 in the Rio Tinto stripes and 8116 in Rio Tinto silver with a consist of S and C type waggons. 16th June 2018. GeoData.
196-02.jpg
196-02210 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
218-01.jpg
218-01210 viewsYandi, river access road that runs between Roy Hill Rd and Yandi Junction, sort of following the train line, Toyota Land Cruiser Toy Titan, 1994 HJ75 series tray back.
041225_065025.jpg
041225 065025210 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 handbrake detail. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.
207-08.jpg
207-08209 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit.
223-15.jpg
223-15209 viewsPossum Siding, Hamersley Iron loco 7080 a General Electric built Dash 9-44CW model serial 47759 second unit rear view. 21st October 2000.
3610 files on 181 page(s) 11

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional