Pilbara Railways Blog

BHP SD70ACe/Lci unit delivery continues.

2020-08-24 Roland Depth 0 BHP Iron Ore EMD SD70ACe

Another two new SD70ACe/Lci units were delivered to Nelson Point on Sunday 23rd August. 4496 and 4494 were walked the 3.5 km distance from the Pilbara Ports Authority.

Read more…

Responsive image

Delivery of SD70ACe/Lci units continues.

2020-08-23 Roland Depth 0 BHP Iron Ore EMD SD70ACe

BHP's new SD70ACe/Lci units are being delivered to Nelson Point by Mammoet then unloaded at the Hard Stand by a 'Loco Lift' or modular gantry system. The locos tip the scales at 180 tonnes.

Read more…

Responsive image

BHP latest loco delivery.

2020-08-21 Roland Depth 0 BHP Iron Ore EMD SD70ACe

BHP has a further six SD70ACe/Lci units arrive.

Read more…

Responsive image