Most viewed - Jim Bisdee Pilbara related images. |

6986 0017 viewsWelshpool, Goninan Open Day 27th October, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079.
Jim Bisdee photo.
|
|

153336 viewsBassendean, an unidentified Goninan rebuild GE CM40-8M unit for BHP Iron Ore under construction. Date Feb 1994.
Jim Bisdee photo.
|
|

169486 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5480 serial G6061-1 being prepped for rebuilding into 5658. October 1993.
Jim Bisdee photo.
|
|

197956 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 2 end. Sept 2003.
Jim Bisdee photo.
|
|

226536 viewsBassendean, during an Open Day at the Goninan workshops, Robe River's AE Goodwin built ALCo M636 model unit 9411 serial G6060-2 is in the middle of being rebuilt into a GE CM40-8M model. 9411 was built in July 1971, when delivered it carried road number 262.002, then following completion of the construction phase was re-numbered to 1711, before again being re-numbered to 9411. 20th July 1991.
Jim Bisdee photo.
|
|

1049 0016 viewsWelshpool, Goninan Open Day 27th October, 1988. View of the assembly floor area, brand new GE CM39-8 locomotive 5631 serial 5831-10 / 88-080 under construction for Mt Newman Mining with sister unit 5632 inline behind it.
Jim Bisdee photo.
|
|

1051 0016 viewsWelshpool, Goninan Open Day 27th October, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079 out the front of the workshop on display.
Jim Bisdee photo.
|
|

3585 0015 viewsBassendean, Wood St, delivery of the final BHP CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160. Unit was rebuilt as one of three with an electronic fuel injected prime mover by Goninan from Comeng built ALCo M636 unit 5486 serial C6084-2. Date July 1995.
Jim Bisdee photo.
|
|

5945 001 Welshpool 1987April5 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5453 serial G6012-2 built by AE Goodwin in 1969 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive. In this April 1987 view the process has started with the bogies and fuel tank removed. By February 1988 it would be the final C36-7M built for Mt Newman Mining as 5513. April 1987.
Jim Bisdee photo.
|
|

6991 001 Welshpool 198809045 viewsWelshpool, Goninan workshops, brand new Mt Newman Mining's GE model CM39-8 loco 5630 'Zeus' serial 5831-09 / 88-079 is lashed down on a road transport float ready for haulage to Port Hedland in this 4th September 1988 image.
Jim Bisdee photo.
|
|

6996 001 Welshpool 198808195 viewsWelshpool, Goninan workshops, under construction Mt Newman Mining's GE model CM39-8 loco 5630 'Zeus' serial 5831-09 / 88-079, 19th August 1988 image.
Jim Bisdee photo.
|
|

6997 001 Welshpool 198808195 viewsWelshpool, Goninan workshops, under construction Mt Newman Mining's GE model CM39-8 loco 5630 'Zeus' serial 5831-09 / 88-079, 19th August 1988 image.
Jim Bisdee photo.
|
|

169425 viewsBassendean, Goninan GE CM40-8M rebuild unit for BHP Iron Ore 5653 'Chiba' serial 8412-10 / 93-144 sits out the back on shop bogies still under construction in the October 1993 image as Westrail P class loco P 2014 looks on.
Jim Bisdee photo.
|
|

169435 viewsBassendean, Goninan GE CM40-8M rebuild unit for BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143, rebuilt from Mt Newman Mining AE Goodwin built ALCo M636 unit 5482 serial G6061-3, being prepped for road haulage to Port Hedland. October 1993.
Jim Bisdee photo.
|
|

169475 viewsBassendean, an overview of the rear of Goninan's workshops, Westrail P class and Mt Newman Mining's AE Goodwin built ALCo M636 unit 5480 serial G6061-1 being prepped for rebuilding into 5658. October 1993.
Jim Bisdee photo.
|
|

169535 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5483 serial G6061-4 being prepped for rebuilding into 5659 with the 251 engine and alternator visible. October 1993.
Jim Bisdee photo.
|
|

169545 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5483 serial G6061-4 being prepped for rebuilding into 5659 with the 251 engine and alternator visible and other 251's to the right. October 1993.
Jim Bisdee photo.
|
|

197945 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 2 end. Sept 2003.
Jim Bisdee photo.
|
|

197975 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 1 end. Sept 2003.
Jim Bisdee photo.
|
|

208465 viewsBassendean, Goninan workshops, newly completed BHP Iron Ore CM40-8M rebuild unit 5637 'De Grey' serial 8181-01 / 92-123 sits on a Bell road transport float bound for Port Hedland. 5637 was rebuilt from AE Goodwin ALCo C636 unit 5456 serial G6012-5. January 1992 image.
Jim Bisdee photo.
|
|
|
|