|
|

060111 2305472 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2306499 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2307537 viewsKopi, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2308506 viewsKopi, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2309495 viewsKopi, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2310521 viewsKopi, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2311485 viewsKopi, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2312526 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2313490 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2314501 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2315491 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2316511 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2317490 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2318483 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2319536 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2320512 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2321810 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|

060111 2322825 viewsWarramboo, located at the 190.2 km with now disused station building on the left, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 shunts empty grain waggons into the grain loop for loading. 11th January 2006.
|
|

060111 2323517 viewsWarramboo, located at the 190.2 km and opened with the line in May 1913, with now disused station building on the left, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 shunts empty grain waggons into the grain loop for loading. 11th January 2006.
|
|

060111 2324548 viewsWarramboo, located at the 190.2 km with now disused station building on the left, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 shunts empty grain waggons into the grain loop for loading. 11th January 2006.
|
|
|
|