|
|

130705 0610599 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
|
|

130705 0611506 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
|
|

130705 0612546 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0613501 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0614438 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0615432 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0616462 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0617472 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0618441 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0619471 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0620512 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0621450 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0622492 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0623458 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0624465 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0625494 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0626463 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0627465 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 across Birdseye Hwy as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0628461 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130705 0629462 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|
|
|