Last additions - 030407 |

030407 094417381 viewsMinnipa, station located at the 253.4 km, opened as terminus in May 1913, became a through station in August 1914. Train control booth and waiting shelter. 7th April, 2003.Jan 27, 2015
|
|

030407 094220391 viewsMinnipa, station yard view looking north down No. 3 Road, crossover for grain siding and points for storage roads on the left, points, lever and indicator for No. 1 Road of mainline on the right. 7th April, 2003.Jan 27, 2015
|
|

030407 094147392 viewsMinnipa, station yard view from the grain siding storage roads looking north, mainline to the right, silo out-flow spouts. 7th April 2003.Jan 27, 2015
|
|

030407 094128412 viewsMinnipa, station yard overview looking north from the south end of yard down mainline, concrete silo complexes and out-flow spouts on the left with sidings running behind camera. Train control booth and shelter can be made out behind the second point lever - indicator. 7th April , 2003.Jan 27, 2015
|
|

030407 092840401 viewsYaninee, trailing view of an empty grain train behind a trio of former Australian National Co-Co locomotives with rebuilt former AE Goodwin ALCo model DL531 830 class ex 839, serial no. 83730, rebuilt by Port Augusta Workshops to DA class, leading two AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962, running express on the mainline. 7th April, 2003.Jan 27, 2015
|
|

030407 092829424 viewsYaninee, empty grain train behind a trio of former Australian National Co-Co locomotives with rebuilt former AE Goodwin ALCo model DL531 830 class ex 839, serial no. 83730, rebuilt by Port Augusta Workshops to DA class, leading two AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962, run through express on the mainline. 7th April, 2003.Jan 27, 2015
|
|

030407 085902446 viewsYaninee, station yard overview looking south for the north end, concrete SACBH silo complexes, points, lever and indicator, train control booth and shelter visible on the left. 7th April, 2003.Jan 27, 2015
|
|

030407 085725537 viewsYaninee, station located at the 237.6 km, opened in April 1915, train control booth and shelter. 7th April 2003.Jan 27, 2015
|
|

030407 085559539 viewsYaninee, station yard overview looking north for the south end, concrete SACBH silo complexes, points, lever and indicator, mainline can be seen running straight into the distance. 7th April, 2003.Jan 27, 2015
|
|

030407 083535557 viewsWudinna, empty grain stands on the main awaiting departure north with a trio of former Australian National Co-Co locomotives with rebuilt former AE Goodwin ALCo model DL531 830 class ex 839, serial no. 83730, rebuilt by Port Augusta Workshops to DA class, leading two AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.Jan 27, 2015
|
|

030407 083438531 viewsWudinna, empty grain stands on the main awaiting departure north with a trio of former Australian National Co-Co locomotives with rebuilt former AE Goodwin ALCo model DL531 830 class ex 839, serial no. 83730, rebuilt by Port Augusta Workshops to DA class, leading two AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.Jan 27, 2015
|
|

030407 083422554 viewsWudinna, empty grain train shunts back onto the empty portion on the mainline prior to departing north, with a trio of former Australian National Co-Co locomotives with rebuilt former AE Goodwin ALCo model DL531 830 class ex 839, serial no. 83730, rebuilt by Port Augusta Workshops to DA class, DA 4 leading two AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.Jan 27, 2015
|
|

030407 083408541 viewsWudinna, empty grain train shunts back onto train, former Australian National Co-Co locomotives AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.Jan 27, 2015
|
|

030407 083359504 viewsWudinna, empty grain train shunts back onto train on the mainline, former Australian National Co-Co locomotive AE Goodwin ALCo model DL531 830 class units 851 serial no. 84137 has been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.Jan 27, 2015
|
|

030407 082757542 viewsWudinna, empty grain train shunts back into the grain siding with a trio of former Australian National Co-Co locomotives with rebuilt former AE Goodwin ALCo model DL531 830 class ex 839, serial no. 83730, rebuilt by Port Augusta Workshops to DA class, DA 4 leading two AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.Jan 27, 2015
|
|

030407 082751532 viewsWudinna, empty grain train shunts back into the grain siding, former Australian National Co-Co locomotives AE Goodwin ALCo model DL531 830 class units 842, serial no. 84140 and 851 serial no. 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April, 2003.Jan 27, 2015
|
|

030407 082744535 viewsWudinna, empty grain train shunts back into the grain siding, former Australian National locomotive AE Goodwin ALCo model DL531 830 class units 851 serial 84137 has been on the Eyre Peninsula since delivered in 1962. 7th April 2003.Jan 27, 2015
|
|

030407 082730560 viewsWudinna, empty grain train shunts back across Gooch Tce grade crossing with a trio of former Australian National locomotives with rebuilt former AE Goodwin ALCo model DL531 830 class ex 839, serial 83730, rebuilt by Port Augusta Workshops to DA class, DA 4 leading two AE Goodwin ALCo model DL531 830 class units 842, serial 84140 and 851 serial 84137, 851 having been on the Eyre Peninsula since delivered in 1962. 7th April 2003.Jan 27, 2015
|
|

030407 082709540 viewsWudinna, view looking south as the empty rake of bogie grain waggons is shunted into the siding for loading, showing HAN and HCN types of bogie grain hoppers. Concrete SACBH grain complex, horizontal grain bunker can be made out on the left. 7th April 2003.Jan 27, 2015
|
|

030407 082655569 viewsWudinna, view looking south as the empty rake of bogie grain waggons is shunted into the siding for loading, showing HAN and HCN types of bogie grain hoppers. Concrete SACBH grain complex. 7th April 2003.Jan 27, 2015
|
|
| 66 files on 4 page(s) |
 |
3 |
|