Last additions - 0103 |

103-17500 viewsWahgunyah station yard overview, super phosphate sheds on the left track, portable station building in middle of frame, silos in distance, scotch block and point levers in foreground.Aug 12, 1990
|
|

103-16486 viewsWahgunyah portable station building, staff hut, 3/4 view, LHS showing ablution block.Aug 12, 1990
|
|

103-15467 viewsWahgunyah portable station building, staff hut, 3/4 view, super phosphate shed and unloading contraption in the background.Aug 12, 1990
|
|

103-14499 viewsRutherglen station building rear overview, now restored and occupied by the local Lions Club.Aug 12, 1990
|
|

103-13475 viewsRutherglen, portable station building, staff hut, 3/4 view.Aug 12, 1990
|
|

103-12486 viewsRutherglen, portable station building, staff hut, front view.Aug 12, 1990
|
|

103-11498 viewsRutherglen, remains of gangers hut, not turntable pivot in middle of broad gauge rails.Aug 12, 1990
|
|

103-10495 viewsSpringhurst station yard view looking north, mainline points on No.2 Rd for the Wahgunyah line have been spiked and clipped normal, standard gauge flyover on right, yard being rationalised, note redundant disc signal post 5 on ground.Aug 12, 1990
|
|

103-09485 viewsSpringhurst, semaphore signal post 4 with the top of the dolls cut off and the signal for the Wahgunyah line, standard gauge flyover on bank, point rodding, looking south from No.2 Rd.Aug 12, 1990
|
|

103-08469 viewsSpringhurst station yard view, staff exchange platform, elevation from access stairs, platform on the left and silo complex on the right, between No.2 and 3 Roads.Aug 12, 1990
|
|

103-07465 viewsSpringhurst V/Line broad gauge Plasser 07-16B Production Tamper or track tamper with V/Line asset number 6-52-013, an unidentified ballast regulator and a Tamper CSC-2 crib and shoulder compactor with V/Line asset number 6-57-008, track machines.Aug 12, 1990
|
|

103-06494 viewsSpringhurst V/Line broad gauge Plasser 07-16B Production Tamper or track tamper with V/Line asset number 6-52-013.Aug 12, 1990
|
|

103-05473 viewsSpringhurst station building overview, staff exchange platform and walkway across tracks, apparatus set up gauge, signal levers visible in windows, staff exchange box on station wall.Aug 12, 1990
|
|

103-04496 viewsSpringhurst station building overview, staff exchange platform and walkway across tracks, apparatus set up gauge, signal levers visible in windows, staff exchange box on station wall.Aug 12, 1990
|
|

103-03482 viewsSpringhurst station building overview, staff exchange platform and walkway across tracks, apparatus set up gauge laying on No.3 Rd.Aug 12, 1990
|
|

103-01478 viewsSpringhurst automatic staff exchanger cover in-between broad gauge running lines, point rodding under tracks.Aug 12, 1990
|
|

103-02475 viewsSpringhurst yard view, staff exchange platform, auto exchanger cover, point rodding, tamper, silo complex and bunker, loading platform.Aug 12, 1990
|
|
|
|
|
|