Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - non iron ore

Last additions - Pilbara negative and digital Albums - non iron ore
206-32.jpg
206-32239 viewsAn empty train on the Yarrie (former Goldsworthy) line with a string of Golynx ore waggons, built by Goninan WA to a Lynx Engineering design, and then the two types of the waggons from the Phelps Dodge Copper Mine, the ribbed units are built by Portec USA and the smooth ones built by Gunderson USA. All of these are belly dump waggons as opposed to the BHP fleet of rotary dump bodies.Oct 01, 2014
206-31.jpg
206-31289 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' with a string of Golynx ore waggons, built by Goninan WA to a Lynx Engineering design, these are belly dump waggons as opposed to the BHP fleet of rotary dump bodies.Oct 01, 2014
206-30.jpg
206-30212 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.Oct 01, 2014
206-29.jpg
206-29208 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.Oct 01, 2014
206-28.jpg
206-28197 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.Oct 01, 2014
206-27.jpg
206-27194 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.Oct 01, 2014
206-26.jpg
206-26193 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.Oct 01, 2014
206-25.jpg
206-25209 viewsThe signs for Telfer, along the same lines as the Woodie Woodie signs.Oct 01, 2014
206-24.jpg
206-24199 viewsThe signs for Telfer, along the same lines as the Woodie Woodie signs.Oct 01, 2014
206-23.jpg
206-23209 viewsToad yelling some sort of abuse to Pope, at Carawine Pool.Oct 01, 2014
206-22.jpg
206-22201 viewsWhere Carawine Creek joins the Oakover River.Oct 01, 2014
206-21.jpg
206-21180 viewsCarawine Pool at Carawine Gorge, looking north.Oct 01, 2014
206-20.jpg
206-20284 viewsThe western wall of Carawine Pool.Oct 01, 2014
206-19.jpg
206-19262 viewsThe western wall of Carawine Pool.Oct 01, 2014
206-18.jpg
206-18274 viewsThe western wall of Carawine Pool.Oct 01, 2014
206-17.jpg
206-17272 viewsThe western wall of Carawine Pool.Oct 01, 2014
206-16.jpg
206-16274 viewsCarawine Pool at Carawine Gorge, looking north.Oct 01, 2014
206-15.jpg
206-15283 viewsCarawine Pool at Carawine Gorge, looking north.Oct 01, 2014
206-14.jpg
206-14308 viewsWhere Carawine Creek joins the Oakover River.Oct 01, 2014
206-13.jpg
206-13280 viewsWhere Carawine Creek joins the Oakover River.Oct 01, 2014
547 files on 28 page(s) 12

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional