Last additions - South Australia - Eyre Peninsula Negative and Digital Albums |

130708 0889488 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 20 E, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0888492 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 36 U, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0887495 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 54 S, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0886483 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0885512 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0884523 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0883470 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0882499 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0881466 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0880476 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0879495 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0878511 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0877475 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0876497 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0875519 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0874533 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0873470 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0872504 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0871530 viewsThevenard, view of arriving loaded train from inside the yard.Jan 27, 2015
|
|

130708 0870489 viewsThevenard, view of arriving loaded train from inside the yard.Jan 27, 2015
|
|
| 2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
27 |  |
 |
 |
 |
 |
 |
 |
|