Most viewed - 0206 |

206-19458 viewsThe western wall of Carawine Pool.
|
|

206-32440 viewsAn empty train on the Yarrie (former Goldsworthy) line with a string of Golynx ore waggons, built by Goninan WA to a Lynx Engineering design, and then the two types of the waggons from the Phelps Dodge Copper Mine, the ribbed units are built by Portec USA and the smooth ones built by Gunderson USA. All of these are belly dump waggons as opposed to the BHP fleet of rotary dump bodies.
|
|

206-23425 viewsToad yelling some sort of abuse to Pope, at Carawine Pool.
|
|

206-37412 viewsThe dining area at 42 Kingsmill Street.
|
|

206-22411 viewsWhere Carawine Creek joins the Oakover River.
|
|

206-30411 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
|
|

206-29407 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
|
|

206-24401 viewsThe signs for Telfer, along the same lines as the Woodie Woodie signs.
|
|

206-25401 viewsThe signs for Telfer, along the same lines as the Woodie Woodie signs.
|
|

206-34395 viewsPope Searle getting the hang of Windows.
|
|

206-35389 viewsPossibly a spaghetti sauce.
|
|

206-28386 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
|
|

206-27381 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
|
|

206-33378 viewsAn empty train on the Yarrie (former Goldsworthy) line with a string of Golynx ore waggons, built by Goninan WA to a Lynx Engineering design, and then the two types of the waggons from the Phelps Dodge Copper Mine, the ribbed units are built by Portec USA and the smooth ones built by Gunderson USA and finally the Tomlinson Steel WA built hopper waggons. All of these are belly dump waggons as opposed to the BHP fleet of rotary dump bodies.
|
|

206-36367 viewsThe fridge at 42 Kingsmill Street.
|
|

206-26351 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
|
|

206-21345 viewsCarawine Pool at Carawine Gorge, looking north.
|
|
|
|
|
|
|