Most viewed - 130703 |

130703 0164434 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
|
|

130703 0186434 viewsTooligie, over view of the yard, Ascom Jumbo silo complex over rail loading hopper with four cell concrete silo complex beyond it. Geo location. July 3, 2006.
|
|

130703 0210433 viewsNowhere Else,
|
|

130703 0207432 viewsNowhere Else,
|
|

130703 0183431 viewsTooligie, over view of the grain complex, Ascom Jumbo silo complex with over rail loading hopper and a four cell concrete silo complex beside it. Geo location. July 3, 2006.
|
|

130703 0168430 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
|
|

130703 0279425 viewsKaldow, HAN type bogie grain hopper waggon HAN 38, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130703 0212424 viewsNowhere Else,
|
|

130703 0151422 viewsMurdinga, view looking north at the eight cell concrete silo complex built by SACBH with the Ascom silo visible behind and train being loaded in the siding. Geo location. July 3, 2006.
|
|

130703 0187422 viewsTooligie, over view of the yard, Ascom Jumbo silo complex over rail loading hopper with four cell concrete silo complex beyond it. Geo location. July 3, 2006.
|
|

130703 0189422 viewsTooligie, mixture of steel and timber sleepers on the mainline. July 3, 2006.
|
|

130703 0170416 viewsMurdinga, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of two originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513, fitted with dynamic brakes, started working on the Eyre Peninsula in November 2004.
|
|

130703 0193410 viewsTooligie, overview of the four cell concrete grain silo complex and yard with grain waggon loading finished. Geo location. July 3, 2006.
|
|
|
|
|
|
|