Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > pr_website

Most viewed - pr_website
051022_5797r.jpg
051022 5797r516 viewsPort Hedland port, BHP Billiton's first Electro-Motive SD70ACe to be off loaded in Australia 4311 serial 20038540-012 under tarp seen leaving the port en route to Nelson Point for unloading onto the rails 22nd October 2005.
080612_2546.jpg
080612 2546512 viewsNelson Point, the first BHP Billiton Electro-Motive built SD70ACe 'Pumpkin' unloaded off the heavy lift ship DA QIANG on Thursday 12th June 2008. The crane behind the loco is for removing the tarp the other two are a 300 tonne on the left an a massive 500 tonne on the right.
081225_0501r.jpg
081225 0501r512 viewsWalla Siding on Christmas Day 2008 see an empty 224 waggon train powered by BHP Billiton Electro-Motive built SD70ACe/LC unit 4318 serial 20058712-005 leading CM40-8M unit 5654 running along the passing track to allow a meet with a loaded train, the back track is on the right.
060714_6721r.jpg
060714 6721r511 viewsHesta, 226 km sees BHP Goninan GE rebuild CM40-8M 5657 'Fukuyama' serial 8412-02 / 94-148 with EMD SD40-2 3081 and SD40R 3089 as they struggle upgrade with a loaded Yandi train, mid-train remote units visible are a pair of EMD SD70ACe/LC locos 4302 and 4311 14th July 2006.
051023_6360r.jpg
051023 6360r511 viewsNelson Point service shop, brand new BHP Billiton Electro-Motive built SD70ACe/LC unit 4305 serial 20038540-006 drivers side cab prior to commissioning. Note the windscreen protector in the raised position. 23rd October 2005.
040818_203218r.jpg
040818 203218r509 viewsNelson Point South Yard Prep Facility sees BHP Billiton EMD SD40R unit 3096 serial 31510 originally Southern Pacific SD40 unit SP 8429 rests between jobs on #1 Spur Road 18th August 2004.
090114_0904.jpg
090114 0904508 viewsPort Hedland, the last of the current order at the time and last off the ship, Electro-Motive built SD70ACe/LC loco 4346 serial 20078915-013 swings off Gilbert Street and into Nelson Point via Gate 9 on the 14th January 2009.
040802_141058r.jpg
040802 141058r507 viewsGoldsworthy Junction, BHP Billiton Goninan GE built CM39-8 5632 'Poseidon' serial 5831-11 / 88-081 in charge of the 'Recycle Rake' is traversing the Transfer Road, this train conveys ore from Nelson Point to Finucane Island, sometimes twice a day. The line to the right is the line to the Junction, Yarrie and Bing. 1410 hrs 2nd August 2004.
040812_155940r.jpg
040812 155940r506 viewsGoldsworthy Junction BHP Billiton Goninan GE rebuild CM40-8M 5639 'Corunna Downs' serial 8281-03/92-128 is on the Yarrie line with a mixed ballast and loaded ore train awaiting a Pilot to come out from Hedland to pilot the train into Nelson Point yard at 1600 hrs 12th August 2004.
090113_0757.jpg
090113 0757505 viewsPort Hedland, brand new Electro-Motive built SD70ACe/LC unit 4345 serial 20078915-012 leaves the port of Port Hedland and heads for Nelson Point to put placed on rails. Kingston Transport provide the 128 wheel floats and prime movers. 13th January 2009.
040807_082023r.jpg
040807 082023r502 viewsPort Hedland, Gilbert Street, EMD SD40R unit 3097 serial 31569 and originally Southern Pacific SD40 SP 8409 is the final member of the SD40 units and is being road delivered by Kingston Heavy Haulage 7th August 2004.
040809_161352r.jpg
040809 161352r496 viewsNelson Point BHP Billiton SD40 yard pilot unit 3080 serial 33674 originally Southern Pacific SD40 SP 8482 and wearing former owner IC&E blue and yellow livery crosses the BI-LO grade crossing with a loaded rake for Car Dumper 3 9th August 2004.
040807_112612r.jpg
040807 112612r495 viewsPort Hedland, Gilbert Street, BHP Billiton EMD SD40R unit 3095 serial 33677 originally Southern Pacific SD40 SP 8485 being road delivered by Kingston Heavy Haulage on a 168 wheel float 7th August 2004.
140603_0699r.jpg
140603 0699r494 viewsHere's the Troopy at the panel shop with a complete new LHS panel viewed from the back, I'm talking to Keith from the panel shop. June 2014.
040807_082350r.jpg
040807 082350r491 viewsPort Hedland, Gilbert Street, EMD SD40R unit 3097 serial 31569 and originally Southern Pacific SD40 SP 8409 is the final member of the SD40 units and is being road delivered by Kingston Heavy Haulage 168 wheel float into BHP Nelson Point via Gate 9 7th August 2004.
040819_040126r.jpg
040819 040126r491 viewsNelson Point, BHP Billiton EMD SD40R unit 3087 serial 31519 and originally Southern Pacific SD40 SP 8438 has been placed at the wheel lathe road for attention in the morning 19th August 2004.
080524_2247r.jpg
080524 2247r490 viewsBoodarie, panoramic view of FMG's General Electric built Dash 9-44CW unit 004 serial 58181 leading two sister units, 130 ore waggons and a two waggon compressor set as they pass in front of the failed BHP Billiton HBI plant. 24th May 2008.
050204_080056r.jpg
050204 080056r488 viewsMooka, BHP GE AC6000 final unit 6077 serial 51069 with EMD SD40R 3091 serial 31496 originally Southern Pacific SD40 SP 8415 power along at the 30 km mark with an empty 200 waggon train, smoke can just been seen coming from mid train units 6071 and 3083 4th February 2005.
050204_080155r.jpg
050204 080155r485 viewsMooka, BHP mid train units of GE AC6000 6071 'Chichester' serial 51063 with the metal windscreen protecting blinds up and EMD SD40-2 unit 3083 serial 786170-2 originally Union Pacific UP 3500 at close to line speed of 80 kph/h at the 30 km, 4th February 2005.
051022_6093r.jpg
051022 6093r484 viewsNelson Point hard stand area, BHP Billiton's brand new Electro-Motive built SD70ACe/LC unit 4301 serial 20038540-002 sits on the heavy haul float under its' tarp late in the afternoon light on the 22nd October 2005. It was unloaded the next morning.
342 files on 18 page(s) 13

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional