Most viewed - pr_website |

110318 9580r526 viewsGoldsworthy Junction, BHP Billiton 4319 'Jarturtu' serial 20058712-006 and EMD SD70ACe/LC built in London Ontario by Electro-Motive in the second order of units for BHP. The unit is heading up an empty train on the 'Avoidance Road' with second unit being 4307 from the original unit order. Jarturtu is an Western Desert Aboriginal word for tree or gum tree. 18th March 2011.
|
|

110318 9465r525 viewsBing Siding and an empty heads into the passing track behind Electro-Motive built SD70ACe/LCi unit 4305 'Coonarie' serial 20038540-006 from the original BHP order for these locomotives but without the isolated cab. It leads CM40-8M unit 5649. 4305 was traded back to Progress Rail and sent back to the USA in January 2015. 18th March 2011.
|
|

040811 161750r522 viewsGoldsworthy Junction, BHP GE AC6000 6075 'Newman' serial 51067 is in mid-train controlling remote service on a loaded train with the windscreen protecting blinds up and leading EMD SD40R unit 3090 serial 33680 originally Southern Pacific SD40 SP 8488 11th August 2004.
|
|

050625 3784521 viewsAllan Siding, at the 51 km just east of Node 3 on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner waiting for an empty train to pull in clear into the siding on its way back to Hedland 25th June 2005.
|
|

040810 171258r520 viewsAt the 76 km grade crossing BHP Billiton GE AC6000 6076 'Mt Goldsworthy' serial 51068 leads an all bubble paint quin consist on the main with EMD SD40R 3091 serial 31496 originally Southern Pacific SD40 SP 8415 and mid train units CM40-8M 5636 leading newly delivered SD40R units 3095 and 3096. This crossing has been moved since Tabba Siding was built in this location. 10th August 2004.
|
|

040811 173538r520 viewsGoldsworthy Junction BHP GE AC6000 6077 'Nimingarra' serial 51069 and EMD SD40-2 3085 serial 786170-25 formally Union Pacific UP 3523 are in charge of an empty train at signal TR13 (transfer road switch, Goldsworthy Junction) mid-train units can just be seen in frame 11th August 2004.
|
|

091002 2608r520 viewsPort Hedland, at the 11.8 km on the big curve lead controlling remote BHP Billiton locomotive 4354 from the fifth order for nine SD70ACe model EMD units from Electro-Motive and built in London, Ontario in 2009 with serial 20088019-008 controls two older EMD units in an ex-UP SD40-2 3081 and ex-SP SD40R 3091. 4354 would later be named ANZAC and also trial handrail modifications, 2nd October 2009.
|
|

050624 3237519 viewsAllan Siding, 45 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy raising the dust running along the resleepered and tamped section 24th June 2005.
|
|

050624 3268518 viewsBroome Rd grade crossing at the 57.1 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy across the highway 24th June 2005.
|
|

040810 130942r512 viewsThe 226 km between Hesta and Shaw sidings, BHP GE AC6000 6074 'Kalgan' serial 51066 leading EMD SD40R 3088 serial 31513 originally Southern Pacific SD40 SP 8432 with a loaded train powering upgrade 10th August 2004.
|
|

050624 3249507 viewsTabba Tabba Creek, 46.5 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy on top of the bridge 24th June 2005.
|
|

050625 3779505 viewsDe Grey at the 54 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its way back to Hedland 25th June 2005.
|
|

050624 3254500 viewsNode 3 location at the 51 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy passes the node cabin 24th June 2005.
|
|

040810 125600r499 viewsHesta Siding, BHP GE AC6000 6074 'Kalgan' serial 51066 leading EMD SD40R 3088 serial 31513 originally Southern Pacific SD40 SP 8432 with a loaded train powering upgrade 10th August 2004.
|
|

040810 134944r497 viewsGarden Siding, BHP GE AC6000 6074 'Kalgan' serial 51066 leading EMD SD40R 3088 serial 31513 originally Southern Pacific SD40 SP 8432 with a loaded train is in full dynamic with air brake applied to keeps the train under control down the 1 in 40 grade between Shaw and Garden here at the Garden South arrival signal 10th August 2004.
|
|

040811 161635r493 viewsGoldsworthy Junction, BHP GE AC6000 class leader 6070 'Port Hedland' serial 51062 runs through the junction leading EMD model SD40R unit 3089 serial 31512 formally Southern Pacific SD40 SP 8431 with a loaded Yandi train 11th August 2004.
|
|

050624 3297487 viewsDe Grey River bridge, 82.9 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy 24th June 2005.
|
|

050625 3822478 viewsNode #2 at the 38 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.
|
|

050624 3327472 viewsGoldsworthy Siding, 110.8 km on the GML sees BHP Billiton Goninan GE rebuild model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy entering the passing siding. 24th June 2005.
|
|

090915 2477r327 viewsForrest Siding, north end looking south on the FMG line at the 125.75 km. This siding was orginally 3 km long before having the north end becoming duplicated back to Durack and the south end extended 3 km. 15th of September 2009. Geodata location data.
|
|
346 files on 18 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
17 |
|