Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > pr_website

Most viewed - pr_website
170915_0709.jpg
170915 07092903 viewsGreat Northern Highway 18.2 km grade crossing, empty Roy Hill fuel train powers along bound for Tad Yard with General Electric built ES44ACi unit RHA 1019 serial 64300 leading eleven of Roy Hill's twelve tank waggons. 15th September 2017. View map here.
170915_0720r.jpg
170915 0720r2897 viewsGreat Northern Highway 18.2 km grade crossing, Roy Hill fuel tank waggon TA 1008 one of twelve built by China Southern Rail in Zhuzhou China with a 96,000 litre capacity. 15th September 2017. View map here.
150130_7611.jpg
150130 76112893 viewsPort Hedland, right hand side rear view of Roy Hill's General Electric built ES44ACi unit RHA 1010 serial 62582, this angle shows the size of the radiator wing section. 29th January, 2015.
110414_0246r.jpg
110414 0246r2888 viewsThomas Yard, the final member of FMG's 56 tonne capacity flat waggons for the Rail Train, RT 19 built in China by CSR at the Yangtze Rolling Stock Company in 2010. 14th April 2011.
080120_1491r.jpg
080120 1491r2879 viewsRowley Yard, FMG's General Electric built Dash 9-44CW DC locomotive 008 serial 58185. These units were some of the last of this model built by GE. 20th January 2008.
160306_1428.jpg
160306 14282865 viewsGreen Pool, two Rio Tinto General Electric built ES44ACi units 9103 serial 61941 and 9110 serial 62541 coupled back to back, view of radiator sections. 6th March 2016. View location here.
150129_7450.jpg
150129 74502865 viewsPort Hedland, Roy Hill's General Electric built ES44ACi unit RHA 1013 serial 62585 is their first locomotive to be delivered off the vessel Ocean Charger and being transported by ALE to Roy Hill's flash butt yard. Seen here leaving the Port Hedland port. 29th January 2015.
050824_0681.jpg
050824 06812862 viewsCape Lambert, Pilbara Iron Robe River Goninan GE rebuild CM40-8M locomotive 9424 serial 6266-7/89-84 from Robe River C636 ALCo 9424 which was originally built in November 1968 as #343 for Spokane Portland & Seattle serial 6010-4 prior to be purchased by Robe in May 1981. Seen here on the 24th August 2005. Photo by Phil 'Fridge' Ludbrook.
150314_7807.jpg
150314 78072847 viewsWedgefield, stowed in a yard awaiting more rail to be laid, Roy Hill rotary tip 70m³ capacity ore waggon GA 2231 built by China Southern Rail in Zhuzhou China. The yellow circle indicating the rotary coupler end. 14th March 2015.
130815_2574.jpg
130815 25742842 viewsBarker Siding, FMG has ten 82.4 tonne capacity air operated side dump waggons built in USA by JK-CO in 2012. SDC 09 sits at the ballast loading point. 15th August 2013.
061026_0359r.jpg
061026 0359r2832 viewsSeven Mile, retired Robe River ALCo units in preparation to travel to Perth. Comeng WA ALCo rebuild C636R 9426 serial WA143-1 leads the all ALCo line up. 26th October 2006.
Geoffrey Higham image.
171204_1017r.jpg
171204 1017r2821 viewsBoodarie, BHP over bridge, CFCLA's Goninan ALCo to GE rebuild CM40-8M locomotive CD 4301 serial 2160-03 / 96-202, was originally Mt Newman Mining's Comeng NSW built ALCo M636 serial C6104-1 #5500, then Robe River unit 9410 before going to CFCLA in 2012. Be being delivered to Roy Hill's flash butt yard by Doolan's Heavy Haulage. 4th December 2017. View map here.
090122_1804r.jpg
090122 1804r2808 viewsWedgefield, Asset Kinetics yard, off hire units from the FMG railway construction stored awaiting their fate. All Comeng WA ALCo rebuilds, DR 8404 'Vera' serial WA135 / C6040-01 and DR 8402 'Margaret' serial WA135 / C6011-02 are both C636R models, while the obscured unit is DR 8401 'Jean' serial WA143-1 also an C636R model.
150412_7918r.jpg
150412 7918r2794 viewsBoodarie, Roy Hill's General Electric built ES44ACi class leader RHA 1001 serial 62573 and named 'Ginny' after Gina Rinehart's daughter Ginia, leads the rest of the fleet near the Flash Butt Welding Yard. 12th April 2015. View map here.
150131_7722.jpg
150131 77222790 viewsBoodarie, right hand side front view of Roy Hill's General Electric built ES44ACi unit RHA 1007 serial 62579 on the BHP line overpass, 30th January, 2015.
160306_1430.jpg
160306 14302789 viewsGreen Pool, right hand side view of the hood of Rio Tinto's General Electric built ES44ACi unit 9103 serial 61941. View location here.
171222_1135.jpg
171222 11352785 viewsBallast Spur A, Roy Hill's General Electric built ES44ACi units RHA 1020 serial 64301 and RHA 1007 cover the three CFCLA Goninan ALCo to GE rebuild units CM40-8M CD 4303, CD 4302 and CD 4301 during mainline load testing of the three lease units. 22nd December 2017.
151230_9701.jpg
151230 97012781 viewsPort Hedland, left hand side rear view of Roy Hill's General Electric built ES44ACi unit RHA 1017 serial 63828, this angle shows the size of the radiator wing section. 30th December 2015.
180701_9521r.jpg
180701 9521r2781 viewsThomas Yard, FMG 100 tonne capacity flat waggon F 06. Built by CSR Yangtze Rolling Stock Co. at their Zhuzhou works in China.
090912_2277r.jpg
090912 2277r2770 viewsBoodarie, at the entrance to the Herb Elliot port car dumper balloon loop the final unit of FMG's 15 General Electric built Dash 9-44CW locos 015 serial 58192 with compressor set 9003-9004 shunts from the loaded waggon line to the empty waggon line at the 4.2 km under Proceed Authority 57 to make way for the incoming loaded train. 12th September 2009.
357 files on 18 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional