Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > pr_website

Most viewed - pr_website
150412_7909.jpg
150412 7909951 viewsBoodarie, Roy Hill Tad Yard under construction with an ex-Victorian Railways T class in the Pilbara, who would've thought?! Now owned by CFCLA T class T 387 a Clyde Engineering EMD model G8B serial 65-417 with CFCLA ballast cars. 12th April 2015. View map here.
030726_121315r.jpg
030726 121315r949 viewsNelson Point Loco Overhaul Workshop sees BHP Billiton Goninan GE build CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081 as it waits for a new engine. Although this was the first unit painted, sister loco 5639 saw the first mainline working of the new scheme to Yandi. This shot was taken on Saturday 26th July 2003.
170727_9632r.jpg
170727 9632r948 viewsRoy Hill ballast waggon, BA class BA 1404, one of ten built by China Southern Rail in Zhuzhou China, seen here on the BHP line flyover. 27th July 2017. View map here.
180117_1148r.jpg
180117 1148r945 viewsGreat Northern Highway, 18.2 km grade crossing sees CFCLA Goninan ALCo to GE rebuild CM40-8M unit CD 4302 originally Robe River Comeng NSW built ALCo M636 serial C6103-1 #9421, rebuilt by Goninan in 1993 with serial 8297-2/93-137 then to CFCLA in 2012 powering a loaded fuel train as part of the mainline testing of these units prior to ore train service. 17th January 2018.
160306_1432.jpg
160306 1432935 viewsGreen Pool, left hand side view Rio Tinto General Electric built ES44ACi unit 9110 serial 62541. 6th March 2016. View location here.
090912_2277r.jpg
090912 2277r935 viewsBoodarie, at the entrance to the Herb Elliot port car dumper balloon loop the final unit of FMG's 15 General Electric built Dash 9-44CW locos 015 serial 58192 with compressor set 9003-9004 shunts from the loaded waggon line to the empty waggon line at the 4.2 km under Proceed Authority 57 to make way for the incoming loaded train. 12th September 2009.
040127_163743r.jpg
040127 163743r932 viewsNelson Point, SD40-2 loco 3085 serial 786170-25 originally Union Pacific unit UP 3523 stands out the front of the Locomotive Overhaul Shop, awaiting repairs 27th January 2004.
171222_1129.jpg
171222 1129920 viewsBallast Spur A, Roy Hill's General Electric built ES44ACi units RHA 1007 serial 62579 and RHA 1020 cover the three CFCLA Goninan ALCo to GE rebuild units CM40-8M CD 4301, CD 4302 and CD 43031 during mainline load testing of the three lease units. 22nd December 2017.
160319_1914.jpg
160319 1914918 viewsGreat Northern Hwy, 18.2 km grade crossing, Roy Hill empty train #96 with General Electric built ES44ACi unit RHA 1006 serial 62578 leading 116 ore waggons with a mid-train unit visible then another 116 ore waggons. 16th March 2016. View map here.
180701_9485r.jpg
180701 9485r915 viewsRoy Hill track formation near the 63 km. Sleepers are moulded RH for Roy Hill and AS68 as manufactured to suit AS68 rail profile. The rail is moulded 136 10 VT NIPPON 2014 4 which translates to 136 Ib/yard (or 68 kg/m), 10 for Low Alloy, VT for processes of hydrogen elimination as Vacuum Treated, NIPPON is the manufacturer Nippon Steel, Japan, 2014 year rolled and 4 is month rolled.
040403_103310r.jpg
040403 103310r914 viewsNelson Point, Car Dumper 3, BHP GE AC6000 6071 'Chichester' serial 51063 and SD40-2 unit 3083 serial 786170-2 originally Union Pacific UP 3500 push the empty rake towards the south yard in a method called the 'Pull-Push' style of spotting and clearing rakes 3rd April 2004.
150129_7443.jpg
150129 7443908 viewsPort Hedland, Roy Hill's General Electric built ES44ACi unit RHA 1013 serial 62585 is their first locomotive to be delivered off the vessel Ocean Charger and being transported by ALE to Roy Hill's flash butt yard. Seen here leaving the Port Hedland port. 29th January 2015.
031109_140045r.jpg
031109 140045r907 viewsNelson Point, the first actual EMD SD40 model locomotive to arrive in Australia GECX 6415 serial 31542 frame 7861-52 built April 1966 for Southern Pacific as SP 8461 and still wearing previous owner IC & E blue and / yellow livery with 'fire cracker' aerial waits patiently on the back of a Brambles heavy-haul float with the tarp due to some quarantine issues and an officer from AQIS was in attendance as foreign soil had been found 9th November 2003.
151231_9740r.jpg
151231 9740r907 viewsGreat Northern Highway 18.2 km grade crossing, Roy Hill's General Electric built ES44ACi loco RHA 1016 serial 63827 being delivered by ALE as it crosses the Roy Hill railways grade crossing. 31st December 2015. View map here.
050319_0082r.jpg
050319 0082r906 viewsNelson Point, Ex Southern Pacific SD40T-2 loco 8335 serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, this unit was purchased as a spares source for the other SD40 style units. The T signifies that it is a Tunnel motor with a modified radiator intake to allow 'cool' running through the Sierra Nevada tunnels. And the 'M' with a lighting rod through it meant that it was a master unit for radio controlled helpers, used in the Tehachapi mountains. 19th March 2005.
110619_1916.jpg
110619 1916904 viewsBarker Siding which is the ballast loading point, one of two FMG ballast plough waggons BP 01, built in China by CSR at the Yangtze Rolling Stock Company in 2010. 19th June 2011.
070923_1044r.jpg
070923 1044r904 viewsPort Hedland, Wilson Street, two Kingston Mack prime movers power the 256 wheel float with the second Metso built rotary dumper cell for FMG. Seen here approaching the Redbank Bridge. Of note is these cells for FMG will clamp the top of the ore waggon, similar to the Pilbara Iron dumpers, while the BHP cells clamp down on side pockets in the waggons. Sunday 23rd September 2007.
080304_2196r.jpg
080304 2196r900 viewsRowley Yard, FMG's new ore waggon pair Control waggon 2620 and Slave waggon 1619, built in China by CSR at the Zhuzhou Rolling Stock Works in 2007. 4th March 2008.
081225_0652r.jpg
081225 0652r899 viewsChapman Siding, even on Christmas Day the trains keep rolling, here FMG General Electric built Dash 9-44CW units 010 serial 58187 and 014 serial 58191 power a loaded 'Rocket Fines' train through the cutting at Fan Belt Hill. 25th December 2008.
180117_1145r.jpg
180117 1145r897 viewsGreat Northern Highway, 18.2 km grade crossing sees Roy Hill loaded fuel train with General Electric built ES44ACi units RHA 1018 serial 63829 leading RHA 1019, CFCLA lease unit Goninan ALCo to GE rebuild CM40-8M unit CD 4302 and RHA 1013 with eleven loaded fuel tank waggons. CD 4302 is the only unit powering as it was being tested. 17th January 2018.
342 files on 18 page(s) 4

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional