Most viewed - Waggons_and_consists_PN_SteelLink. |

160524 4053390 viewsBinduli, Melbourne bound steel train service 3PM4, RKLY 20981 container waggon, built by EPT NSW in 1980-81 as an NODY, open waggon before being heavily modified by ANI Engineering in 1998, loaded with two 20' Pacific National Royal Wolf containers RWLU 815017 and 814910.
|
|

160524 4289389 viewsWest Kalgoorlie, 1MP2 steel train, RKLY 20383, totally unrecognisable from original build by EPT NSW 1979-81 as part of a batch of two hundred BDY type 14.20 metre open waggons, had several recoding's prior to its current guise, loaded with two RH type coil containers or 'butter boxes' RH 166 and RH 277.
|
|

160524 4285386 viewsWest Kalgoorlie, 1MP2 steel train, RKLY 20812, originally built by EPT NSW in 1980-81 as part of a batch of two hundred NODY type 14.20 metre open waggons, recoded as NKHY ~1097-91 then RKHY before having the body completely removed to current code, loaded with two RH type RH 230 and RH 509 coil containers or 'butter boxes'.
|
|

160531 9834385 viewsBinduli, 3PM4 steel train, an 80 kph runner with solo Goninan built GE model Cv40-9i NR class unit NR 94 serial 7250-06/97-300 will enter West Kalgoorlie yard to shunt on a crew coach and more empty waggons.
|
|
| 244 files on 13 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
13 |
|