Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - non iron ore

Most viewed - Pilbara negative and digital Albums - non iron ore
198-19.jpg
198-19552 viewsPort Hedland Port, view of the Cargill Salt berth and loader, or PHPA Berth No. 3, in this 2001 view, the then new bulker loader is under construction and manganese is stockpiled on the ground. The BHP Finucane Island berth is visible along with the overland conveyor for the HBI plant.
205-08.jpg
205-08552 viewsWittenoom, Bee Gorge, rock carving.
237-01.jpg
237-01552 viewsWater damaged culverts located on the upper reaches of the Edgina Creek, near the Woodstock South location on the BHP Newman line. Geo Data .
196-28.jpg
196-28551 viewsWittenoom Gorge, Gorge Mine area, asbestos mining remains, view looking north east from remains of railways and mill towards power station, concrete pad is former workshops.
198-05.jpg
198-05551 viewsWittenoom, Colonial Mine, asbestos mining remains, front view of throttle control box, battery box and wheel and brake arrangement of battery locomotive GEMCO Hauler serial 12304-05/10/65, motor H.P. 2/11, volts 80, drawbar pull (lbs.) 1250 built by George Moss Pty Ltd Leederville, WA.
237-09.jpg
237-09551 viewsA lunch break on the bank of the Shaw River, just north of where the Shaw Patch Creek joins the Shaw River. Geodata .
195-11.jpg
195-11550 viewsWittenoom, top of Bee Gorge, snappy gums and ant hills.
195-36.jpg
195-36550 viewsWittenoom Gorge, Australian Blue Asbestos or ABA Colonial Mill, view of primary crushing building, shows conveyor housing and silo structure with piping and a steep stair walkway from the lower levels to the crushing shed.
196-31.jpg
196-31550 viewsWittenoom Gorge, Gorge Mine area, asbestos mining remains, view of the remains of the demolished buildings which formed the mill here, looking north east towards the power station.
204-05.jpg
204-05550 viewsYampire Gorge, remains of asbestos mining, how foundations were made, buried 44 gallon drums filled with rock.
195-32.jpg
195-32549 viewsWittenoom, West Gorge, Australian Blue Asbestos or ABA Colonial Mine, remains of a building on the adit level adjacent to no. 30.
198-17.jpg
198-17549 viewsPort Hedland Port, view of the Cargill Salt berth and loader, or PHPA Berth No. 3, in this 2001 view, the then new bulker loader is under construction and manganese is stockpiled on the ground. The BHP Finucane Island berth is visible along with the overland conveyor for the HBI plant.
204-06.jpg
204-06548 viewsYampire Gorge, road out of the mining area with warning sign, Toyota HJ75 Landcruiser ute, PH 5090.
206-09.jpg
206-09548 viewsCarawine Pool at Carawine Gorge, looking north.
160101_9764.jpg
160101 9764547 viewsWittenoom Gorge, Joffre Creek, Fourth Crossing Pool view of the western wall gorge, via Bolitho Road. Geodata: -22.2804483 118.3212850
204-11.jpg
204-11546 viewsYampire Gorge, road out of the gorge area with warning sign, Toyota HJ75 Landcruiser ute, PH 5090.
198-15.jpg
198-15545 viewsPort Hedland Port, view of the Cargill Salt berth and loader, or PHPA Berth No. 3, in this 2001 view, the then new bulker loader is under construction and manganese is stockpiled on the ground. The BHP Finucane Island berth is visible along with the overland conveyor for the HBI plant.
204-09.jpg
204-09545 viewsYampire Gorge, warning sign courtesy of the Department of Regional Development and North West.
206-31.jpg
206-31545 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' with a string of Golynx ore waggons, built by Goninan WA to a Lynx Engineering design, these are belly dump waggons as opposed to the BHP fleet of rotary dump bodies.
195-09.jpg
195-09544 viewsWittenoom, Bee Gorge, view from top of cat walk looking east, where cat walk joins the top of the range.
547 files on 28 page(s) 9

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional