Most viewed - Western Australian Negative and Digital Albums |
208-2-13174 viewsMt Lawley, Westrail L class L 272 Clyde Engineering EMD model GT26C serial 69-621 leads the empty cars from the Indian Pacific to Forrestfield.
|
|
208-2-21174 viewsMt Lawley, Westrail L class L 263 Clyde Engineering EMD model GT26C serial 68-553 leads the empty cars from the Indian Pacific to Forrestfield.
|
|
208-2-32174 viewsDimboola, the Up Dimboola pass lead by Victorian Railways liveried B class B 65, Clyde Engineering EMD model ML2 serial ML2-6 with D van and N set.
|
|
160522 2025174 viewsParkeston, 5MP2 steel train, one of the bar coupled pair of waggons making up RKAF type 2-pack rail transport waggon RKAF 4 for a length of 29.8 metres loaded with new rail, these 'pairs' are rebuilt from a pair of RKJX type waggons. The RKJX were rebuilds from V/Line VOBX type waggons.
|
|
160525 4958174 viewsWest Kalgoorlie, Aurizon intermodal train 2MP1, crew accommodation coach QCBY 10, started life as Victorian Railways Newport Workshops 1952 build as AS class no. 15, first class air conditioned corridor car, then AS 210, BS 210 and BS 10. Sold to West Coast Railway, then RTS / Gemco and finally to Aurizon.
|
|
202-16173 viewsMeckering, looking east, grain elevator with loadout dual overhead bunker bins with #1 closet to camera, the goods loop is running to the right of the loadout bin.
|
|
208-1-03173 viewsBassendean, Rail Heritage WA Museum, exhibit #15, Pm class Pacific 4-6-2 steam engine Pm 701, class leader of thirty five such units built by North British Locomotive Co. Introduced in 1950, the class lasted until 1971.
|
|
208-2-01173 viewsToodyay, emus at the Free Range Emu Farm.
|
|
208-2-07173 viewsToodyay, emus at the Free Range Emu Farm.
|
|
209-17173 viewsMidland, the midday east bound freighter arrives behind Westrail's Clyde Engineering built EMD GT26C model L class units L 262 serial 68-552 and L 269.
|
|
209-18173 viewsMidland, the midday east bound freighter arrives behind Westrail's Clyde Engineering built EMD GT26C model L class units L 262 serial 68-552 and L 269.
|
|
209-19173 viewsMidland, the midday east bound freighter arrives behind Westrail's Clyde Engineering built EMD GT26C model L class units L 262 serial 68-552 and L 269.
|
|
060116 2683173 viewsAOPY and WOE iron ore waggons loaded with lump ore depart West Kalgoorlie for Esperance as the Prospector awaits entry to continue to Kalgoorlie, while Pope Searle takes in the action, West Kalgoorlie 16th January 2006.
|
|
051101 6420173 viewsParkeston, AHBY 0059 one of sixty five AHBY type ballast hoppers built by EDI Rail at their Port Augusta Workshops for ARG in 2001-02 for the Darwin line, also the FMG construction in 2008, here in limestone quarry products service.
|
|
160522 2032173 viewsParkeston, 5MP2 steel train, RKCX type open waggon RKCX 1109, built by Victorian Railways Bendigo Workshops in 1978 as VOCX type open waggon, recoded to VOCY in 1980, back to VOCX in 1982, then to NRC in 1994 as ROBX, current code from 1995.
|
|
160522 2056173 viewsBinduli, 5MP2 steel train to Perth, lead locomotive Goninan built GE model Cv40-9i NR class NR 68 serial 7250-12/96-270 in current owners corporate livery.
|
|
160525 4957173 viewsWest Kalgoorlie, Aurizon intermodal train 2MP1, crew accommodation coach QCBY 10, started life as Victorian Railways Newport Workshops 1952 build as AS class no. 15, first class air conditioned corridor car, then AS 210, BS 210 and BS 10. Sold to West Coast Railway, then RTS / Gemco and finally to Aurizon.
|
|
199-16172 viewsMeckering, National Rail NR class units NR 19 and NR 20 Goninan built GE Cv40-9i models lead train 7PM5 as they power out of the loop following a cross with the Prospector 1420 hrs 21st June 1997.
|
|
201-14172 viewsMidland, the first Perth built NR class NR 61 Goninan GE model Cv40-9i serial 7250-11/96-263 shunts at Midland with two brand new NR units and waggon RQRX type RQRX 60177.
|
|
208-1-11172 viewsToodyay, emus at the Free Range Emu Farm.
|
|
4386 files on 220 page(s) |
|
|
|
|
|
|
|
|
10 | |
|
|
|
|
|
|
|