Most viewed - Western Australian Negative and Digital Albums |

051101 6420654 viewsParkeston, AHBY 0059 one of sixty five AHBY type ballast hoppers built by EDI Rail at their Port Augusta Workshops for ARG in 2001-02 for the Darwin line, also the FMG construction in 2008, here in limestone quarry products service.
|
|

140601 4645654 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHCH type waggon CHCH 7739 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. June 1, 2014.
|
|

060528 4423653 viewsWest Kalgoorlie, AOPY 32389, fleet number 916, one of seventy ex ANR coal waggons rebuilt from AOKF type by Bluebird Engineering SA in service with ARG on Koolyanobbing iron ore trains. They used to be three metres longer and originally built by Metropolitan Cammell Britain as GB type in 1952-55, May 28, 2006.
|
|

060527 4072653 viewsLeonora, WN 524, pneumatic discharge nickel concentrate waggon, one of thirty built by AE Goodwin NSW as WN type in 1970 for WMC.
|
|

160531 9923653 viewsWest Kalgoorlie, 1MP2 steel train, RKYY type wide steel plate tilt waggon RKYY 7094 one of twenty seven units built by AN Rail Islington Workshops in 1995-96. Loaded with steel plate.
|
|

160525 4951653 viewsWest Kalgoorlie, Aurizon intermodal train 2MP1. Inline fuelling waggon QQFY 4271, originally built for Commonwealth Railways in 1976 by Perry Engineering SA as type RMX, recoded to AQMX, 70 tonne bogies became AQMY, then RQMY, to QR National in 2007. Seen here with two 30' diesel fuel tanktainers from Nantong Tank Container Company, NTTU 330006 and NTTU 330001 each with a 30800 litre capacity, and fuel transfer or pump unit QRIP 06.
|
|

200-18652 viewsMoorine Rock, Australian National AN class AN 6 a Clyde Engineering built EMD model JT46C serial 93-1302 and ALF class ALF 24 on the mainline with a Perth bound freight, June 22, 1997.
|
|

209-10652 viewsADG-ADA-ADG triple set on an up service from Midland.
|
|

060117 2710652 viewsBardoc, Q 317 leads the loaded Malcolm freighter train 2029 with an AQCY type container waggon with nickel residue container COR 5727. The AQCY type waggons were built by WAGR Midland Workshops as WFX type between 1969 and 1974.
|
|

160522 2038652 viewsParkeston, 5MP2 steel train, RQCY type flat waggons RQCY 701 carrying the bogies for Trans-Perth B Set 116. Originally built by the Victorian Railways Newport Workshops as an FQX type container waggon in 1973, recoded to VQCX in 1979, then to NRC as RQCX, then the current code from 1995.
|
|

160525 4957652 viewsWest Kalgoorlie, Aurizon intermodal train 2MP1, crew accommodation coach QCBY 10, started life as Victorian Railways Newport Workshops 1952 build as AS class no. 15, first class air conditioned corridor car, then AS 210, BS 210 and BS 10. Sold to West Coast Railway, then RTS / Gemco and finally to Aurizon.
|
|

209-06650 viewsEast Perth Passenger Terminal, Westrail L class L 272 Clyde Engineering EMD model GT26C serial 69-621 shunts the car carrying waggons into the unloading dock off the Indian Pacific.
|
|

208-2-14650 viewsGuildford, looking towards the station from the Perth end.
|
|

160531 9893650 viewsWest Kalgoorlie, 1MP2 steel train, NR 79
|
|

208-2-04649 viewsToodyay, emus at the Free Range Emu Farm.
|
|

060527 4079649 viewsLeonora, WN 504, pneumatic discharge nickel concentrate waggon, one of thirty built by AE Goodwin NSW as WN type in 1970 for WMC.
|
|

160531 9858649 viewsBinduli, 3PM4 steel train, RKXF 60213 a jumbo plate waggon, RKXF 60213 was originally built by Comeng NSW in 1971/72 as part of a batch of fifty BCX type waggons of 75 foot length and originally numbered BCX 21818. Other codes carried were NQDX, NKDX then RKXX before 70 tonne bogies were fitted in 1995 for the current code. 31st May 2016 at West Kalgoorlie.
|
|

160531 9914649 viewsWest Kalgoorlie, 1MP2 steel train, RKLY 20556
|
|

202-07648 viewsMeckering, looking east, the points for the crossing loop with dual control point machine and relay interlocking room which houses the backup power plant, silos in the distance.
|
|

202-31648 viewsYandi One, 307 km grade crossing, mid-train remote CM40-8MEFI Goninan GE unit 5666 'Taranto' serial 8412-11/94-157 and CM40-8ML unit 5663 'Newcastle' show the difference in the ALCo builds by the fuel tanks, 5666 was originally an M636C built by Comeng while 5663 was originally built by AE Goodwin.
|
|
| 4844 files on 243 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
11 |  |
 |
 |
 |
 |
 |
 |
|