Most viewed - Western Australian Negative and Digital Albums |

231020 8229328 viewsParkeston, QQYY type 40' container waggon QQYY 57939 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001146 with Tronox decal and yellow corner posts and CRM 001047 with Cristal decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

231020 8230328 viewsParkeston, QQYY type 40' container waggon QQYY 57690 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000966 with Tronox decal and yellow corner posts and CRM 001716 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

240401 4975328 viewsKalgoorlie, Aurizon's 1029 Malcolm Freighter, waggon AQIY 00017 loaded with two 20 sulphur containers, a 25UA roll top Bis Deliver Every Day BICN 107500[9] and a 25U0 hard top Bis Industries BISU 100091[2]. The AQIY were originally built as the CQYY but CFCLA did not buy them, Bradken then stored them as KQYY. When Aurizon bought them they had the handbrake relocated to the middle of the waggon from the end. 1st of April 2024.
|
|

240328 2809328 viewsWOE type iron ore waggon WOE 33353 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-058 and fleet number 852, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

240328 3019328 viewsLoaded Koolyanobbing iron ore train 5041 with Mineral Resources Ltd MHPY type iron ore waggons MHPY 00033 and MHPY 00034 built by CSR Yangtze Co China with serial numbers 2014 / 382-33 and 2014 / 382-34 in 2014 as a batch of 382 pairs, these bottom discharge hopper waggons are operated in 'married' pairs. March 28, 2024.
|
|

240328 3106328 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train with 57' DQHY type flat waggon built by CRRC, China in 2022 as a batch of sixty for Watco to carry the CSA acid tanks, DQHY 13036 with CSA-0107 acid tank. March 28, 2024.
|
|

100731 02354327 viewsWO type iron ore waggon WO 31267 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 150 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on loaded train 6413 at Binduli Triangle, 31st July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|

160409 IMG 7051327 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7066327 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7069327 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7214327 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7258327 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7395327 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

231020 8266327 viewsBinduli, 5029 Malcolm Freighter, AZKY type anhydrous ammonia tank waggon AZKY 32236, one of twelve built by Goninan WA in 1998 as class WQK for Murrin Murrin traffic, fitted with Bis INDUSTRIES anhydrous ammonia tank A11S.
|
|

231020 8281327 viewsBinduli, 5029 Malcolm Freighter, AQNY type container waggon AQNY 32154 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with a two Bis Industries hard-top 25U0 type sulphur container BISU 100108 and undecorated BISU 100037.
|
|

231020 8173327 viewsParkeston, QQYY type 40' container waggon QQYY 57706 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000132 with Cristal decal and yellow corner posts and CRM 001024 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

231020 8245327 viewsParkeston, QQYY type 40' container waggon QQYY 57923 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000878 with Tronox decal and CRM 000575 with Tronox decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

240401 4970327 viewsKalgoorlie, Aurizon's 1029 Malcolm Freighter, waggon AQIY 00020 loaded with two 20' sulphur containers, a Bis Deliver Every Day 25UA type BICN 105100[7] and a 25U0 type BISU 100076[4]. The AQIY were originally built as the CQYY but CFCLA did not buy them, Bradken then stored them as KQYY. When Aurizon bought them they had the handbrake relocated to the middle of the waggon from the end. 1st of April 2024.
|
|

240328 2820327 viewsWOE type iron ore waggon WOE 33694 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons and was fleet number 7105 before the sides were painted yellow and Aurizon logos, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

240328 2954327 viewsWOE type iron ore waggon WOE 33414 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-119 and a build date of 04/2006 with a revised load of 82.5 tonnes and was fleet number 8913. It has had the sides repainted Aurizon yellow and logo just visible. Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|
| 4833 files on 242 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
216 |  |
 |
 |
 |
 |
 |
 |
|