Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums

Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums
060113_2426.jpg
060113 2426392 viewsCeduna, loaded gypsum train 6DD2 behind the triple Clyde Engineering EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 08:10 AM on the Friday the 13th January 2006.
130708_0706.jpg
130708 0706392 viewsPenong Junction, location opened in February 1966, located at the 429.7 km, looking at the Mallee shelter shed - combined train control room, junction points and point indicator, Penong line curving around to the left.
030416_094308.jpg
030416 094308392 viewsWirrida Siding, looking south towards Tarcoola from the south end. Located at the 641 km from the 0 datum at Coonamia and 137 km north of Tarcoola between Carnes and Manguri on the Tarcoola - Alice Springs line. GeoData location. 16th April 2003.
030406_110700.jpg
030406 110700391 viewsCoomunga, on the siding, two Transfield track machines, TMN 02, a ballast regulator and a track tamper. 6th April 2003.
030406_115530.jpg
030406 115530391 viewsPort Lincoln, derailment damaged SAR Islington Workshops built HAN type bogie wheat waggon HAN 4, close up of non-handbrake end damage, stored at the workshops yards. 6th April 2003.
030409_124139.jpg
030409 124139391 viewsRudall, located at the 172.7 km and opened in July 1913, station overview looking south from the north end, points for grain and goods siding off to the left, station build can be seen in the distance on the right.
030409_150000.jpg
030409 150000391 viewsUngarra, located at the 108.1 km and opened in March 1913 as the temporary terminus till July 1913. Station shelter shed, located between the mainline and the good and grain loop.
060113_2459.jpg
060113 2459391 viewsThevenard, yard view looking west from No. 13 points at the front of the maintenance 'yard' with the disused grain bunker and 6DD3 running along beside the silos as it unloads at GRA, further silos form the background with the maintenance centre with stand-by loco 871 on hand and a couple of ENH hopper waggons. 13th January 2006.
060110_2156.jpg
060110 2156391 viewsNear the 64 km between Pillana and Cummins, empty grain train behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 then sent to the Eyre Peninsula in July 2004, and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of photo.
060110_2151.jpg
060110 2151391 viewsPillana, former station site, 59 km, empty grain train behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 then sent to the Eyre Peninsula in July 2004, and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of photo.
060110_2158.jpg
060110 2158391 viewsNear the 64 km between Pillana and Cummins, empty grain train behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 then sent to the Eyre Peninsula in July 2004, and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of photo.
060110_2162.jpg
060110 2162391 viewsCummins, view across Railway Terrace of empty grain train on the mainline to shunt the Cummins Bunker track to pick up the rake on the left, behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965. Sent to the Eyre Peninsula in July 2004. Approx. location of image.
060110_2163.jpg
060110 2163391 viewsCummins, view across Railway Terrace of empty grain train shunting the Cummins Bunker track to pick up empty hoppers, behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
030406_142926.jpg
030406 142926390 viewsKapinnie, brand new AusBulk sign for Kapinnie silos. 6th April 2003.
030409_104422.jpg
030409 104422390 viewsWaddikee loaded grain train operating south to Cummins behind 830 class units 851 and 842 and DA class DA 4 with a rake of XNW waggons behind DA 4.
030409_152437.jpg
030409 152437390 viewsUngarra, the peace is shattered as a loaded grain train storms upgrade through the station behind 830 class unit 851 AE Goodwin ALCo model DL531 serial 84137, fellow 830 class 842 serial 84140 and a rebuilt DA class unit DA 4 trailing view with the ENHV waggons as the continue south.
030409_154635.jpg
030409 154635390 viewsMoody Tank, signage outlining function.
060111_2296.jpg
060111 2296390 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.
030406_142256.jpg
030406 142256389 viewsKapinnie, track view looking west towards the terminus showing the siding extension with offset in rails, silos and loading ramp behind camera. 6th April 2003.
030409_124518.jpg
030409 124518389 viewsRudall, located at the 172.7 km and opened in July 1913, station building view of the new one built in 1966.
2177 files on 109 page(s) 27

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional