Most viewed - South Australia - Eyre Peninsula Negative and Digital Albums |

130703 0252146 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
|
|

130703 0282146 viewsKaldow, HAN type bogie grain hopper waggon HAN 25, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130703 0294146 viewsKaldow, HCN type bogie grain hopper waggon HCN 9, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|

130705 0612146 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
|
|

130708 0758146 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 4 B, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
|
|

130708 0784146 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 32 H, with hungry boards still fitted loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
|
|

130708 0861146 viewsPenong Junction, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 43 B, without hungry boards loaded with gypsum [url=https://goo.gl/maps/45FyW] located at the 429.7 km[url].
|
|

130708 0897146 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 43 B, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|

130708 0907146 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 19, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|

130708 0945146 viewsThevenard,
|
|

161109 1937146 viewsMoule, originally built by Kinki Sharyo as the NH type for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type in 1984, ENH 49 with hungry boards loaded with gypsum.
|
|

161109 1947146 viewsMoule, originally built by Kinki Sharyo as the NH type for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type in 1984, ENH 55 with hungry boards loaded with gypsum.
|
|

161109 1964146 viewsThevenard, train 4DD4 enters the yard behind Genesee & Wyoming locomotives Clyde Engineering EMD model JL22C unit 1601 serial 71-728 and 1603 serial 71-730 as they negotiate the yard to the GRA siding balloon for unloading.
|
|

060111 2316145 viewsNantuma, Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo units 850 and 905 as they round the bend just north of the old station site at the 183 km. Their next shunt will be Warramboo. 11th January 2006.
|
|

060113 2486145 viewsKevin, ARG 1600 class narrow gauge loco 1604 a Clyde Engineering built EMD model JL22C serial 71-731, originally built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981 arrives with empty gypsum train 6DD3. 13th January 2006.
|
|

060113 2509145 viewsKevin, empty train 6DD3 shunts back onto the triangle leg behind triple NJ/1600 class units, Clyde Engineering built EMD JL22C models, originally coded the NJ class and built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981 and recoded to the 1600 class. 13th January 2006.
|
|

060113 2529145 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.
|
|

130703 0214145 viewsNowhere Else,
|
|

130703 0249145 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
|
|

130703 0259145 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
|
|
2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
90 |  |
 |
 |
 |
 |
 |
 |
|