Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

0250


250-04.jpg

Hamersley Iron meet with 9-44CW units at Lyre Siding.
21st October 2000.
Robe M636 ALCo units stored.
C636R shunts Cape Lambert.
22nd October 2000.

36 files, last one added on Nov 12, 2020
Album viewed 146 times

0251


251-12.jpg

BHP C36-7M units, AC6000 6074 and CM39-8 5631 at Nelson Point.
Ballast waggons and ALCo 5499.
Taken Saturday 22nd April 2000.

37 files, last one added on Nov 12, 2020
Album viewed 143 times

0252


252-25.jpg

Hamersley Iron ballast train Cockatoo Loop and Rosella Junction.
24th November 2001.
BHP AC6000 6074 Nelson Point, and a loaded Yarrie with 5645.
Early December.

37 files, last one added on Nov 27, 2020
Album viewed 82 times

0253


253-14.jpg

Hamersley Iron cross at Dugite.
Dredge Vlaanderen XI Hedland harbour.
CFCLA ballast waggons delivered.
Late 2002.

37 files, last one added on Sep 12, 2021
Album viewed 81 times

0254


254-05.jpg

Boodarie, Flash Butt and Bing with CM39-8, C37-7M, C636, AC6000 and CM40-8MEFI models.
Aug-Sept 2001.

18 files, last one added on Sep 12, 2021
Album viewed 58 times

0255


255-22.jpg

Robe River 162.2 km spur.
Siding Three.
Empty train at the 71 km and Western Creek interconnecting road.
May 2002.

37 files, last one added on Sep 12, 2021
Album viewed 82 times

0256


256-31.jpg

Robe River action around Maitland Siding.
CM40-8M on loaded and empty trains.
May 2002.

37 files, last one added on Nov 20, 2021
Album viewed 78 times

0257


257-23.jpg

Flash Butt yard Port Hedland
Stored C36-7M locos and redundant Locotrol waggons and others.
Goldsworthy Junction empty trains.

33 files, last one added on Mar 12, 2022
Album viewed 83 times

0258


258-20.jpg

5511, 5512 and 5513 being prepped for road haulage to Perth.
5510, 5506 and 5499 at the old sand tower being stripped.
6076 and 5645 at the LOHS.
May 2002.

37 files, last one added on Jul 04, 2024
Album viewed 40 times

0267


267-09.jpg

Sundowner Special run for 25 years of Alstom - BHP contract.
5634, Sundowner, 5653. 1st roll.
12th of April 2002.

36 files, last one added on Nov 21, 2022
Album viewed 85 times

0268


268-20.jpg

Sundowner Special run for 25 years of Alstom - BHP contract.
5634, Sundowner, 5653. 2nd roll.
12th of April 2002.

37 files, last one added on Dec 23, 2022
Album viewed 85 times

0269


269-25.jpg

Sundowner Special run for 25 years of Alstom - BHP contract.
5634, Sundowner, 5653. 3rd roll.
12th of April 2002.

25 files, last one added on Dec 23, 2022
Album viewed 87 times

0283


283-13.jpg

6076 at BHP wheel lathe.
5508 being readied for Perth.
Robe River quad CM40-8M units at water pipe bridge and the new extension to Harding Siding.
22nd May 2002.

34 files, last one added on Jun 19, 2023
Album viewed 106 times

0284


284-07.jpg

New SD40 units at Nelson Point - August 2004.
Geraldton P class units - November 2004.
AC6000 and SD40 at Bing, late 2004.

37 files, last one added on Mar 02, 2025
Album viewed 32 times

roster_images


3080_roster_lhs_041218_181459.jpg

9 files, last one added on Aug 22, 2023
Album viewed 71 times

Roy_Hill_Rolling_Stock


250501_0379.jpg

Images of the rolling stock employed by Roy Hill.
The ore waggons, fuel tankers and ballast waggons.

256 files, last one added on May 03, 2025
Album viewed 81 times

64 albums on 4 page(s) 4

Random files - Pilbara negative and digital Albums - Iron Ore
247-02.jpg
247-02219 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard waiting to drag a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
050704_3972.jpg
050704 3972189 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons, view of data placard, ladder and valving, on the rear of a loaded ore train.
060429_3764.jpg
060429 3764199 viewsFlash Butt yard, Pony waggon #1, modified from a Magor USA built Oroville Ore waggon, with a Comeng built gantry carrier.
041225_064634.jpg
041225 064634353 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 asset number 2031703. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional