Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

0247


247-09.jpg

Robe River Cape Lambert yard view of ore rake shunts and Dash 8 refuelling.
Empty train at water pipe crossing 37 km.
Wednesday 22nd May 2002.

37 files, last one added on Oct 29, 2020
Album viewed 234 times

0248


248-05.jpg

Hamersley Iron empty at Dingo Siding.
Stored Robe ALCo units at 7 Mile yard.
Saturday 24th April 2004.

25 files, last one added on Nov 03, 2020
Album viewed 142 times

0249


249-36.jpg

BHP Yule River bridge washout.
Fortescue River in flood at Robe River bridge.
Loaded Hamersley Iron at Dingo.
Views of Burrup gas plant.
December 1999.

37 files, last one added on Nov 12, 2020
Album viewed 242 times

0250


250-34.jpg

Hamersley Iron meet with 9-44CW units at Lyre Siding.
21st October 2000.
Robe M636 ALCo units stored.
C636R shunts Cape Lambert.
22nd October 2000.

36 files, last one added on Nov 12, 2020
Album viewed 262 times

0251


251-01.jpg

BHP C36-7M units, AC6000 6074 and CM39-8 5631 at Nelson Point.
Ballast waggons and ALCo 5499.
Taken Saturday 22nd April 2000.

37 files, last one added on Nov 12, 2020
Album viewed 254 times

0252


252-03.jpg

Hamersley Iron ballast train Cockatoo Loop and Rosella Junction.
24th November 2001.
BHP AC6000 6074 Nelson Point, and a loaded Yarrie with 5645.
Early December.

37 files, last one added on Nov 27, 2020
Album viewed 105 times

0253


253-02.jpg

Hamersley Iron cross at Dugite.
Dredge Vlaanderen XI Hedland harbour.
CFCLA ballast waggons delivered.
Late 2002.

37 files, last one added on Sep 12, 2021
Album viewed 99 times

0254


254-24.jpg

Boodarie, Flash Butt and Bing with CM39-8, C37-7M, C636, AC6000 and CM40-8MEFI models.
Aug-Sept 2001.

18 files, last one added on Sep 12, 2021
Album viewed 72 times

0255


255-01.jpg

Robe River 162.2 km spur.
Siding Three.
Empty train at the 71 km and Western Creek interconnecting road.
May 2002.

37 files, last one added on Sep 12, 2021
Album viewed 117 times

0256


256-08.jpg

Robe River action around Maitland Siding.
CM40-8M on loaded and empty trains.
May 2002.

37 files, last one added on Nov 20, 2021
Album viewed 105 times

0257


257-19.jpg

Flash Butt yard Port Hedland
Stored C36-7M locos and redundant Locotrol waggons and others.
Goldsworthy Junction empty trains.

33 files, last one added on Mar 12, 2022
Album viewed 104 times

0258


258-11.jpg

5511, 5512 and 5513 being prepped for road haulage to Perth.
5510, 5506 and 5499 at the old sand tower being stripped.
6076 and 5645 at the LOHS.
May 2002.

37 files, last one added on Jul 04, 2024
Album viewed 62 times

0267


267-28.jpg

Sundowner Special run for 25 years of Alstom - BHP contract.
5634, Sundowner, 5653. 1st roll.
12th of April 2002.

36 files, last one added on Nov 21, 2022
Album viewed 110 times

0268


268-25.jpg

Sundowner Special run for 25 years of Alstom - BHP contract.
5634, Sundowner, 5653. 2nd roll.
12th of April 2002.

37 files, last one added on Dec 23, 2022
Album viewed 114 times

0269


269-16.jpg

Sundowner Special run for 25 years of Alstom - BHP contract.
5634, Sundowner, 5653. 3rd roll.
12th of April 2002.

25 files, last one added on Dec 23, 2022
Album viewed 115 times

0283


283-20.jpg

6076 at BHP wheel lathe.
5508 being readied for Perth.
Robe River quad CM40-8M units at water pipe bridge and the new extension to Harding Siding.
22nd May 2002.

34 files, last one added on Jun 19, 2023
Album viewed 232 times

67 albums on 5 page(s) 4

Random files - Pilbara negative and digital Albums - Iron Ore
234-37.jpg
234-37248 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
040810_144947.jpg
040810 144947274 viewsShaw Siding backtrack, Difco Ohio USA 1967 build short side dump waggon 8701, originally built for Goldsworthy Mining as no. 1, renumbered by Mt Newman as 8701, one five waggons built for Goldsworthy Mining.
210322_9583.jpg
210322 9583270 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
141027_5896.jpg
141027 58961021 viewsWedgefield, Sell and Parker's metal recycling yard, a pile of bits from GE AC6000 unit 6071.

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional