Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

0247


247-01.jpg

Robe River Cape Lambert yard view of ore rake shunts and Dash 8 refuelling.
Empty train at water pipe crossing 37 km.
Wednesday 22nd May 2002.

37 files, last one added on Oct 28, 2020
Album viewed 309 times

0248


248-23.jpg

Hamersley Iron empty at Dingo Siding.
Stored Robe ALCo units at 7 Mile yard.
Saturday 24th April 2004.

25 files, last one added on Nov 03, 2020
Album viewed 169 times

0249


249-21.jpg

BHP Yule River bridge washout.
Fortescue River in flood at Robe River bridge.
Loaded Hamersley Iron at Dingo.
Views of Burrup gas plant.
December 1999.

37 files, last one added on Nov 12, 2020
Album viewed 325 times

0250


250-25.jpg

Hamersley Iron meet with 9-44CW units at Lyre Siding.
21st October 2000.
Robe M636 ALCo units stored.
C636R shunts Cape Lambert.
22nd October 2000.

36 files, last one added on Nov 12, 2020
Album viewed 371 times

0251


251-02.jpg

BHP C36-7M units, AC6000 6074 and CM39-8 5631 at Nelson Point.
Ballast waggons and ALCo 5499.
Taken Saturday 22nd April 2000.

37 files, last one added on Nov 12, 2020
Album viewed 405 times

0252


252-33.jpg

Hamersley Iron ballast train Cockatoo Loop and Rosella Junction.
24th November 2001.
BHP AC6000 6074 Nelson Point, and a loaded Yarrie with 5645.
Early December.

37 files, last one added on Nov 27, 2020
Album viewed 122 times

0253


253-34.jpg

Hamersley Iron cross at Dugite.
Dredge Vlaanderen XI Hedland harbour.
CFCLA ballast waggons delivered.
Late 2002.

37 files, last one added on Sep 12, 2021
Album viewed 122 times

0254


254-07.jpg

Boodarie, Flash Butt and Bing with CM39-8, C37-7M, C636, AC6000 and CM40-8MEFI models.
Aug-Sept 2001.

18 files, last one added on Sep 12, 2021
Album viewed 86 times

0255


255-12.jpg

Robe River 162.2 km spur.
Siding Three.
Empty train at the 71 km and Western Creek interconnecting road.
May 2002.

37 files, last one added on Sep 12, 2021
Album viewed 135 times

0256


256-23.jpg

Robe River action around Maitland Siding.
CM40-8M on loaded and empty trains.
May 2002.

37 files, last one added on Nov 20, 2021
Album viewed 121 times

0257


257-29.jpg

Flash Butt yard Port Hedland
Stored C36-7M locos and redundant Locotrol waggons and others.
Goldsworthy Junction empty trains.

33 files, last one added on Mar 12, 2022
Album viewed 128 times

0258


258-32.jpg

5511, 5512 and 5513 being prepped for road haulage to Perth.
5510, 5506 and 5499 at the old sand tower being stripped.
6076 and 5645 at the LOHS.
May 2002.

37 files, last one added on Jul 04, 2024
Album viewed 77 times

0267


267-15.jpg

Sundowner Special run for 25 years of Alstom - BHP contract.
5634, Sundowner, 5653. 1st roll.
12th of April 2002.

36 files, last one added on Nov 21, 2022
Album viewed 130 times

0268


268-30.jpg

Sundowner Special run for 25 years of Alstom - BHP contract.
5634, Sundowner, 5653. 2nd roll.
12th of April 2002.

37 files, last one added on Dec 23, 2022
Album viewed 136 times

0269


269-10.jpg

Sundowner Special run for 25 years of Alstom - BHP contract.
5634, Sundowner, 5653. 3rd roll.
12th of April 2002.

25 files, last one added on Dec 23, 2022
Album viewed 136 times

0283


283-32.jpg

6076 at BHP wheel lathe.
5508 being readied for Perth.
Robe River quad CM40-8M units at water pipe bridge and the new extension to Harding Siding.
22nd May 2002.

34 files, last one added on Jun 19, 2023
Album viewed 329 times

67 albums on 5 page(s) 4

Random files - Pilbara negative and digital Albums - Iron Ore
250501_0515.jpg
250501 0515246 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3223 - GA 3224, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
22665.jpg
22665420 viewsBassendean, during an Open Day at the Goninan workshops, a new 'Pilbara' cab under construction which will be fitted to a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
0309_210322_9718.jpg
0309 210322 9718109 viewsRobe River ore waggon 309, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
0804_160306_1508.jpg
0804 160306 1508148 viewsRobe River ore waggon 804, built by Centurion Industries WA, fixed coupler non-handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional