Pilbara Railways Scanned and Digital Image Showcase

The entire photo collection with the Toad's Scans images scanned from negatives and slides onto today's digital images


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Jim Bisdee Pilbara related images.


6998_001.jpg

Images taken and scanned by Perth rail photographer Jim Bisdee.
He has kindly made these Pilbara images available for display on this site.
Copyright remains with Jim Bisdee.

121 files, last one added on Feb 12, 2020
Album viewed 214 times

01-06 2018


180615_1579.jpg

Images taken in the first half of 2018.
Includes images from all Pilbara iron ore produces BHP, FMG, Roy Hill and Rio Tinto.

60 files, last one added on Jun 25, 2018
Album viewed 207 times

05-08 2017


170729_0145.jpg

Images taken between May and August 2017.
Includes BHP, Roy Hill, FMG and Rio Tinto with double ES44ACi units on the Deepdale line.

58 files, last one added on Oct 16, 2017
Album viewed 112 times

01-2016


160128_00876.jpg

Photos of new SD70ACe locomotives for BHP.
Removal of Dash 8 locos to scrap.
Scrapping of Dash 8 locos.
BHP rail action for month of January.

33 files, last one added on Jan 31, 2016
Album viewed 459 times

11-2015


151111_9548.jpg

November 2015.
11/11 Rio Cape Lambert to Western Creek.

60 files, last one added on Nov 13, 2015
Album viewed 310 times

05-2015


150523_8201.jpg

Images from May 2015.
Including FMG Solomon line action.
Reclaimer and stacker demolition.
Dash 8 scrapping.
BHP yard action and fuel tank wagons.
Finucane Island ore shuttles.

106 files, last one added on Jan 30, 2016
Album viewed 537 times

10-2014


141027_5885.jpg

Images from October 2014.
Includes the scrapping of the SD40 And AC6000 class units.

45 files, last one added on Oct 27, 2014
Album viewed 976 times

01-2005


050109_092926.jpg

Digital images taken during January 2005.

8 files, last one added on Jan 30, 2016
Album viewed 345 times

2004 01-06


040407_075058.jpg

Digital images taken between January and June 2004.

19 files, last one added on Nov 26, 2017
Album viewed 111 times

0196


196-13.jpg

Images of triple CM40-8M units on loaded trains at BHP Yandi 2.
May 1998.

17 files, last one added on May 21, 2014
Album viewed 317 times

0197


197-02.jpg

View of empty Yarrie bound train with CM39-8 5632 at Goldsworthy Junction.

8 files, last one added on Jul 22, 2014
Album viewed 230 times

0203


203-00.jpg

AC6000 class run an empty train out of Bing Siding 6076 and 6070 mid-train 6077 following a cross with a loaded headed up by the old standard of two pairs of double CM40-8M or Dash 8 units.

26 files, last one added on Aug 16, 2014
Album viewed 341 times

0207


207-06.jpg

Koodaideri entry signs.
BHP Yandi One loadout with new AC6000 locomotives as mid-train units 6074 and 6070.
Yarrie line, Hardie Siding with C36-7M 5513 and CM40-8MEFI 5669 crossing.
See album 221 for the continued sequence at Hardie.
August 1999.

32 files, last one added on Oct 01, 2014
Album viewed 403 times

0218


218-35.jpg

BHP GML line loaded train with C36-7M.
Hamersley Iron C44-0W bank engines at HIY Yandicoogina.

37 files, last one added on Dec 20, 2014
Album viewed 319 times

0219


219-05.jpg

Hammersley Iron C44-9W bank engines at HIY, Yandigoogina.
BHP GML action with C36-7M locomotives.

37 files, last one added on Dec 26, 2014
Album viewed 329 times

0220


220-02.jpg

BHP GML line, Taplin Siding and Ruben Junction, loaded train with C36-7M.
Goldsworthy Junction empty train with CM40-8M.

35 files, last one added on Dec 26, 2014
Album viewed 287 times

44 albums on 3 page(s) 1

Random files - Pilbara negative and digital Albums - Iron Ore
170728_10007.jpg
170728 1000712 viewsBenson Falls, 91 km curve, an empty train blasts up the steep grade behind a General Electric built C44-9W unit 7072 serial 47751 leads two General Electric built ES44DCi units 8140 and 8158, 7072 is from the original delivery of C44-9W units in 1994 and is showing its age. 28th July 2017. GeoData.
229-20.jpg
229-2012 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
170510_8284.jpg
170510 82849 viewsRio Tinto compressor waggon set CB09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
150523_8231.jpg
150523 8231119 viewsNelson Point Yard, view across BI-LO Crossing, a throw back to days that the supermarket was in fact a BI-LO, well before the current Woolworths, and Action before that. Dash 8 units in the yard, on the 5642 with the Steel Train and 5648 with another on a rake of index waggons. The 2km post can just be made out at the third light pole from the right.

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2020 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional