Pilbara Railways Scanned and Digital Image Showcase

The entire photo collection with the Toad's Scans images scanned from negatives and slides onto today's digital images


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Western Australian Negative and Digital Albums > 0202

202-02.jpg
202-02104 viewsMeckering, view across standard gauge tracks at the original standard gauge brick station - waiting shelter.
202-03.jpg
202-03106 viewsMeckering, looking east along the goods siding with the good shed loop points, shed and crane in the distance.
202-04.jpg
202-0492 viewsMeckering, looking east on the crossing loop, goods shed and sidings at left, station building at right.
202-05.jpg
202-0598 viewsMeckering, looking west towards Grass Valley and Perth, the Up departure CTC signals, 2 LA for the main and 2 LB for the loop.
202-06.jpg
202-0698 viewsMeckering, looking east at the Down arrival signal mast, 2 RA and 2 RB, relay room and grain silos in the distance.
202-07.jpg
202-0797 viewsMeckering, looking east, the points for the crossing loop with dual control point machine and relay interlocking room which houses the backup power plant, silos in the distance.
202-08.jpg
202-0894 viewsMeckering, relay interlocking room, exhaust can be seen through wall, door is marked for Telephone, Crankhandle and Pilot Key.
202-09.jpg
202-0992 viewsMeckering, looking east with the mainline on the right and the crossing loop on the left and the back of Up departure signals, 2 RA on the right and 2 RB on the left.
202-10.jpg
202-1093 viewsMeckering, former narrow gauge bridge located south of the standard gauge line.
202-11.jpg
202-1194 viewsMeckering, interlocking arrangement for the grain siding, west end points off the crossing loop.
202-12.jpg
202-1294 viewsMeckering, looking east at the interlocking levers #1 and #2 and Pilot Key box 5A for the goods siding and derail at the west end of the crossing loop.
202-13.jpg
202-1395 viewsMeckering, overview of the interlocking ground frame, 5A Pilot Key and associated rodding and infrastructure for the west end of the goods siding.
202-14.jpg
202-1487 viewsMeckering, view looing east at the catch points and dwarf indicator at the west end of the goods siding, grain bunker and silos with the goods shed and station visible in the distance.
202-15.jpg
202-1591 viewsMeckering, looking east with the points for the hand operated non-interlocked points for the goods loop, grain siding continues on the left skirting the bunker and heading under the silo loading spout, while the goods loop bypasses the silos.
202-16.jpg
202-1690 viewsMeckering, looking east, grain elevator with loadout dual overhead bunker bins with #1 closet to camera, the goods loop is running to the right of the loadout bin.
202-17.jpg
202-1794 viewsMeckering, looking east, the three loadout spouts for the concrete grain silos, DRIFT sign to indicate the grade when loading waggons, station at right and goods shed visible beyond the loadout.
202-18.jpg
202-1876 viewsMeckering, looking west along the grain siding, capstan winch for assisting in moving grain waggons, the three loadout spouts for the concrete grain silos with the two overhead bunker loadouts visible beyond them.
202-19.jpg
202-1975 viewsMeckering, looking east with the grain siding joining the goods loop, then with the goods siding branching off to the left, goods shed and crane on the left, station just visible on the right.
202-20.jpg
202-2078 viewsMeckering, view of the goods shed from the north east end, shows loading dock and ramps.
202-21.jpg
202-2180 viewsMeckering, view of the goods shed from the south east end, shows loading platform, ramps and crane.
32 files on 2 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2020 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional