|

225-20237 viewsAt the 24.1 km grade crossing on the BHP Newman line, General Electric AC6000 model unit 6074 serial 51066 built at GE Erie leads the afternoon empty Yandi mine train as it heads south. This was before the units were named. GeoData.
|
|

225-21248 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
|
|

225-22235 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
|
|

225-23196 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
|
|

225-24238 viewsAt the 24.1 km grade crossing on the BHP Newman line, General Electric AC6000 model unit 6073 serial 51065 built at GE Erie is the mid-train remote for the afternoon empty Yandi mine train as it heads south. This was before the units were named. GeoData.
|
|

225-25229 viewsAt the 24.1 km grade crossing on the BHP Newman line the end of the afternoon Yandi train is seen heading south with last waggon 4305, one of 126 such waggons constructed during 1997 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. This design was designated HC7081. GeoData.
|
|

225-26230 views24.1 km grade crossing on the Newman line, empty train racing off into the distance. GeoData.
|
|

225-27222 viewsBing siding backtrack, a ballast consist of 17 GML bottom discharge waggons and 6 Difco side dump rip rap waggons, possibly an 'emergency' ballast train for the GML line following flood damage. GeoData.
|
|

225-28236 viewsBing siding backtrack, Difco USA built short side dump waggon 4 loaded with rip rap, originally built for GML traffic in 1966, side view. GeoData.
|
|

225-29259 viewsBing siding backtrack, Tomlinson WA built GML ore waggon 8104 loaded with ballast, side view. GeoData.
|
|
|
|
|