Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > BHP_Rolling_Stock_-_Non_Ore

060429_3729.jpg
060429 3729504 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining on the 24th September 1970 by Scotts of Ipswich, one of a batch of nine, one of a batch of nine in the series 6005-6013.
060429_3730.jpg
060429 3730477 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining, builders plate for Scotts of Ipswich Qld with a 24th September 1970 build date, one of nine originally numbered 6005-6013.
060429_3734.jpg
060429 3734552 viewsFlash Butt yard, Pony re-laying waggon, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
060429_3738.jpg
060429 3738498 viewsFlash Butt yard, Pony re-laying waggon, #1, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
060429_3744.jpg
060429 3744467 viewsFlash Butt yard, Pony re-laying flat waggon, in service as a transport waggon for a gantry car and sleepers. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.
060429_3746.jpg
060429 3746502 viewsFlash Butt yard, Pony relaying flat waggon #6? in service on the Pony re-laying train as a transport waggon for a gantry car as pictured. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.
060429_3750.jpg
060429 3750512 viewsFlash Butt yard, Pony re-laying flat waggon, in service as a transport waggon for a gantry car and sleepers. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.
060429_3754.jpg
060429 3754498 viewsFlash Butt yard, Pony re-laying waggon, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
060429_3756.jpg
060429 3756472 viewsFlash Butt yard, Pony re-laying waggon, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
060429_3758.jpg
060429 3758505 viewsFlash Butt yard, Pony re-laying waggon, builders plate originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
060429_3761.jpg
060429 3761511 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining, builders plate for Scotts of Ipswich Qld with a 24th September 1970 build date, one of nine originally numbered 6005-6013.
060429_3762.jpg
060429 3762520 viewsFlash Butt yard, Pony re-laying waggon, #2, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
060429_3763.jpg
060429 3763552 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining in 1970 by Scotts of Ipswich, one of a batch of nine, one of a batch of nine in the series 6005-6013.
060429_3764.jpg
060429 3764484 viewsFlash Butt yard, Pony waggon #1, modified from a Magor USA built Oroville Ore waggon, with a Comeng built gantry carrier.
040806_102956.jpg
0661 Mt Newman Mining Workshops 040806 102956492 viewsFlash Butt yard, heavily modified Magor USA built ex-Oroville Dam ore waggon 661, seen here modified for LocoTrol service and testing.
040806_103206.jpg
0661 Mt Newman Mining Workshops 040806 103206538 viewsFlash Butt yard, heavily modified Magor USA built ex-Oroville Dam ore waggon 661, seen here modified for LocoTrol service and testing.
0661_Mt_Newman_Mining_Workshops_257-11.jpg
0661 Mt Newman Mining Workshops 257-11144 viewsFlash Butt yard, heavily modified Magor USA built ex-Oroville Dam ore waggon 661, seen here modified for LocoTrol service and testing.
0661_Mt_Newman_Mining_Workshops_257-13.jpg
0661 Mt Newman Mining Workshops 257-13163 viewsFlash Butt yard, heavily modified Magor USA built ex-Oroville Dam ore waggon 661, seen here modified for LocoTrol service and testing. Locotrol waggon 2626, converted from a Comeng WA build ore waggon is behind 661.
051001_5729.jpg
0665 Magor USA 051001 5729488 viewsBoodarie, the Steel Train or rail recovery and transport train, cut down by Mt Newman Mining workshops, a Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the end of the steel train.
050319_0137.jpg
0665 Mt Newman Mining Workshops 050319 0137566 viewsNelson Point, view of the Steel Train set sitting out in the South Yard, cut down Magor USA built former Oroville Dam 91 ton ore waggon, now used as the crib waggon on the rear of the Steel Train.
822 files on 42 page(s) 19

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Australian flag  Valid XHTML 1.0 Transitional