|

246-01257 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream, the siding on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. The original line or Mainline is the second from the camera, with the car dumper one Empty Car line closest, and what becomes the car dumper two Loaded Car line is third. 22nd May 2002.
|
|

246-02209 viewsCape Lambert, view of the then new extension to the south for the West Angelas mine was coming on stream, the siding furthest from the camera will become a compressor waggon holding road while the original line or Mainline is the second from the camera, with the car dumper one Empty Car line closest, and what becomes the car dumper two Loaded Car line is third. 22nd May 2002.
|
|

246-03249 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

246-04201 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. The Boat Beach Rd can be seen on the extreme right. 22nd May 2002.
|
|

246-05190 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

246-06201 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

246-07173 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

246-08204 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

246-09195 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

246-10206 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

246-11216 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

246-12194 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

246-13238 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

246-14276 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

246-15258 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

246-16481 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

246-17254 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

246-18271 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

246-19258 viewsCape Lambert, a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

246-20272 viewsCape Lambert, a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|
|