BHP_Rolling_Stock_-_Ore 9001-10000
|
|
|

9020 Comeng 030712 142923484 viewsNelson Point, empty BHP ore waggon 9020, the prototype leader originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. July 12, 2003.
|
|

9020 Comeng 030712 143018150 viewsNelson Point, empty BHP ore waggon 9020, the prototype leader originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.
|
|

9021 Comeng 030712 142242533 viewsNelson Point, empty BHP ore waggon 9021, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. July 12, 2003.
|
|

9023 Comeng 030712 143051459 viewsNelson Point, empty BHP ore waggon 9023, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. July 12, 2003.
|
|

9024 Comeng 030712 143247502 viewsNelson Point, empty BHP ore waggon 9024, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. This view shows the reduced gap between waggons reduced from 1084 to 934 mm to aid the aerodynamics. July 12, 2003.
|
|

9024 Comeng 030712 143256468 viewsNelson Point, empty BHP ore waggon 9024 with drop belly floor, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. July 12, 2003.
|
|

9025 Comeng 030712 143222480 viewsNelson Point, empty BHP ore waggon 9025 with drop belly floor, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. July 12, 2003.
|
|

9025 Comeng 030712 143234145 viewsNelson Point, empty BHP ore waggon 9025 with drop belly floor, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.
|
|

9026 Comeng 030712 143315548 viewsNelson Point, empty BHP ore waggon 9026 with drop belly floor, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. July 12, 2003.
|
|

9065 Comeng 110620 2356498 viewsWalla, loaded BHP ore waggon 9065, renumbered from original Comeng WA build waggon 2701 which was originally built in 1971 as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. June 20, 2011.
|
|

9070 Comeng 110620 1959519 viewsWalla Siding, BHP ore waggon 9070 loaded with Yandi fines, renumbered from 2821, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. June 20, 2011.
|
|

9081 Comeng 110620 2019488 viewsWalla Siding, empty BHP ore waggon 9081, renumbered from 2710, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. June 20, 2011.
|
|

9100 Bradken 041225 064521781 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon and type leader 9100 asset number 2031702. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 9100 has been set up for use as a 'test' waggon with load sensors located all over it. 25th December 2004.
|
|

9100 Bradken 041225 0645411285 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon and type leader 9100 asset number 2031702 and 9101 behind it. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 9100 has been set up for use as a 'test' waggon with load sensors located all over it. 25th December 2004.
|
|

9100 Bradken 041225 064557855 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon and type leader 9100 asset number 2031702 and 9101 behind it. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 9100 has been set up for use as a 'test' waggon with load sensors located all over it. 25th December 2004.
|
|

9100 Bradken 041225 064625862 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon and type leader 9100 asset number 2031702. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 9100 has been set up for use as a 'test' waggon with load sensors located all over it. 25th December 2004.
|
|

9101 Bradken 041225 064634692 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 asset number 2031703. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.
|
|

9101 Bradken 041225 064654636 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 asset number 2031703. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.
|
|

9101 Bradken 041225 065025677 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 handbrake detail. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.
|
|

9538 Bradken 110414 0140148 viewsBoodarie, empty BHP Iron Ore waggon 9538 a Bradken build from August 2010 with the blue ECPB designating Wabtec overlay installed Dec 2010. April 14, 2011.
|
|
|
|