Last additions - 0202 |

202-13233 viewsMeckering, overview of the interlocking ground frame, 5A Pilot Key and associated rodding and infrastructure for the west end of the goods siding.Aug 16, 2014
|
|

202-12243 viewsMeckering, looking east at the interlocking levers #1 and #2 and Pilot Key box 5A for the goods siding and derail at the west end of the crossing loop.Aug 16, 2014
|
|

202-11244 viewsMeckering, interlocking arrangement for the grain siding, west end points off the crossing loop.Aug 16, 2014
|
|

202-10248 viewsMeckering, former narrow gauge bridge located south of the standard gauge line.Aug 16, 2014
|
|

202-09235 viewsMeckering, looking east with the mainline on the right and the crossing loop on the left and the back of Up departure signals, 2 RA on the right and 2 RB on the left.Aug 16, 2014
|
|

202-08240 viewsMeckering, relay interlocking room, exhaust can be seen through wall, door is marked for Telephone, Crankhandle and Pilot Key.Aug 16, 2014
|
|

202-07249 viewsMeckering, looking east, the points for the crossing loop with dual control point machine and relay interlocking room which houses the backup power plant, silos in the distance.Aug 16, 2014
|
|

202-06236 viewsMeckering, looking east at the Down arrival signal mast, 2 RA and 2 RB, relay room and grain silos in the distance.Aug 16, 2014
|
|

202-05244 viewsMeckering, looking west towards Grass Valley and Perth, the Up departure CTC signals, 2 LA for the main and 2 LB for the loop.Aug 16, 2014
|
|

202-03254 viewsMeckering, looking east along the goods siding with the good shed loop points, shed and crane in the distance.Aug 16, 2014
|
|

202-04229 viewsMeckering, looking east on the crossing loop, goods shed and sidings at left, station building at right.Aug 16, 2014
|
|

202-02239 viewsMeckering, view across standard gauge tracks at the original standard gauge brick station - waiting shelter.Aug 16, 2014
|
|
|