Last additions - 0255 |
![Filename=255-17.jpg
Filesize=684KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-17.jpg](albums/Pilbara/255/thumb_255-17.jpg)
255-1719 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-16.jpg
Filesize=664KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-16.jpg](albums/Pilbara/255/thumb_255-16.jpg)
255-1613 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-15.jpg
Filesize=558KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-15.jpg](albums/Pilbara/255/thumb_255-15.jpg)
255-1517 viewsAt the 162.2 km looking north are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale lone is on the left while the spur runs behind the photographer and curves away from the Deepdale line. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-14.jpg
Filesize=616KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-14.jpg](albums/Pilbara/255/thumb_255-14.jpg)
255-1416 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left while the Deepdale line is on the right. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-13.jpg
Filesize=676KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-13.jpg](albums/Pilbara/255/thumb_255-13.jpg)
255-1314 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale line is on the right. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-12.jpg
Filesize=653KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-12.jpg](albums/Pilbara/255/thumb_255-12.jpg)
255-1218 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-11.jpg
Filesize=642KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-11.jpg](albums/Pilbara/255/thumb_255-11.jpg)
255-1116 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-10.jpg
Filesize=419KiB
Dimensions=853x1280
Date added=Sep 12, 2021 255-10.jpg](albums/Pilbara/255/thumb_255-10.jpg)
255-1018 viewsSiding Three looking south at the south end signal for loaded trains or up movements. Various cabinets and DD or dragging equipment detector bars. May 2002.Sep 12, 2021
|
|
![Filename=255-09.jpg
Filesize=527KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-09.jpg](albums/Pilbara/255/thumb_255-09.jpg)
255-0916 viewsSiding Three looking south at the south end points, switch machine and various cabinets and solar panels and DD or dragging equipment detector bars. May 2002.Sep 12, 2021
|
|
![Filename=255-08.jpg
Filesize=594KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-08.jpg](albums/Pilbara/255/thumb_255-08.jpg)
255-0818 viewsSiding Three, swing nose point machine on the south end points riding on concrete sleepers at the 134.7 km. May 2002.Sep 12, 2021
|
|
![Filename=255-07.jpg
Filesize=472KiB
Dimensions=853x1280
Date added=Sep 12, 2021 255-07.jpg](albums/Pilbara/255/thumb_255-07.jpg)
255-0732 viewsSiding Three looking south along the Cape Lambert to Deepdale mainline at the south end signal for the mainline, passing track is on the right with points in the distance. May 2002.Sep 12, 2021
|
|
![Filename=255-06.jpg
Filesize=617KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-06.jpg](albums/Pilbara/255/thumb_255-06.jpg)
255-06748 viewsSiding Three looking south along the Cape Lambert to Deepdale mainline at the south end signals. Passing track is on the right. May 2002.Sep 12, 2021
|
|
![Filename=255-05.jpg
Filesize=523KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-05.jpg](albums/Pilbara/255/thumb_255-05.jpg)
255-0518 viewsSiding Three looking south across the 133.3 km grade crossing with Tamper 1 and a sleeper inserter machine stabled in the back track. Both machines are Fairmont Tamper units. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-04.jpg
Filesize=589KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-04.jpg](albums/Pilbara/255/thumb_255-04.jpg)
255-0421 viewsSiding Three back track, Robe 9456 Tamper 1, a Fairmont Tamper Mk VI switch tamper machine. May 2002.Sep 12, 2021
|
|
![Filename=255-03.jpg
Filesize=534KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-03.jpg](albums/Pilbara/255/thumb_255-03.jpg)
255-0325 viewsSiding Three back track, Fairmont Tamper sleeper inserter machine. May 2002.Sep 12, 2021
|
|
![Filename=255-02.jpg
Filesize=630KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-02.jpg](albums/Pilbara/255/thumb_255-02.jpg)
255-0219 viewsFortescue River bridge on the Robe River Cape Lambert to Deepdale line at the 115.8 km looking south. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-01.jpg
Filesize=598KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-01.jpg](albums/Pilbara/255/thumb_255-01.jpg)
255-0120 viewsFortescue River bridge on the Robe River Cape Lambert to Deepdale line at the 115.8 km looking south. Geodata location here. May 2002.Sep 12, 2021
|
|
|
|
|
|