Last additions |

IC23-CB08 210510 092211 viewsRobe River compressor waggon set CB08, was originally IC 23 with two Kaesir air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert yard May 10, 2021.Aug 27, 2025
|
|

IC22-CB08 210510 092110 viewsRobe River compressor waggon set CB08, was originally IC 22 with air receiver, these waggons were ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert yard May 10, 2021.Aug 27, 2025
|
|

IC22-CB08 210510 092010 viewsRobe River compressor waggon set CB08, was originally IC 22 with air receiver and IC 23 with two Kaesir air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert yard May 10, 2021.Aug 27, 2025
|
|

IC21-CB07 240619 03188 viewsRobe River compressor waggon CB07 was originally IC 21 with two Kaeser air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.Aug 27, 2025
|
|

IC20-CB07 240619 032310 viewsRobe River compressor waggon CB07 was originally IC 20 with air receiver and IC 21 with two Kaeser air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.Aug 27, 2025
|
|

IC20-CB07 240619 03209 viewsRobe River compressor waggon CB07 was originally IC 20 with air receiver. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.Aug 27, 2025
|
|

IC20-CB07 240619 03197 viewsRobe River compressor waggon CB07 was originally IC 20 with air receiver and IC 21 with two Kaeser air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.Aug 27, 2025
|
|

1211 210322 97377 viewsRobe River ore waggon 1211, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.Aug 27, 2025
|
|

1208 180616 164110 viewsRobe River ore waggon 1208, built by Bradken Rail Qld in May 2012, fixed coupler non-handbrake side loaded view at the 38.5 km, Harding on the Cape Lambert line, June 16, 2018.Aug 27, 2025
|
|

1206 180616 16929 viewsRobe River ore waggon 1206, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.Aug 27, 2025
|
|

1205 180616 172311 viewsRobe River ore waggon 1205, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.Aug 27, 2025
|
|

1192 180616 170612 viewsRobe River ore waggon 1192, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.Aug 27, 2025
|
|

1191 180616 170219 viewsRobe River ore waggon 1191, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.Aug 27, 2025
|
|

1182 210322 97628 viewsRobe River ore waggon 1182, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021Aug 27, 2025
|
|

1179 210322 969813 viewsRobe River ore waggon 1179, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021Aug 27, 2025
|
|

1177 210322 976112 viewsRobe River ore waggon 1177, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021Aug 27, 2025
|
|

1170 210322 976414 viewsRobe River ore waggon 1170, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021Aug 27, 2025
|
|

1166 210322 97259 viewsRobe River ore waggon 1166, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021Aug 27, 2025
|
|

1166 180616 172912 viewsRobe River ore waggon 1166, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.Aug 27, 2025
|
|

1159 210322 968511 viewsRobe River ore waggon 1159, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021Aug 27, 2025
|
|
18740 files on 937 page(s) |
1 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|