Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
180616_1664.jpg
180616 1664323 viewsCooya Pooya, 32 km on the Cape Lambert line, Rio Tinto loco 9103 with serial 61941 a GE Erie built GE model ES44ACi from the 1st order in Rio Tinto Stripes livery and 9108 serial 62539 are tied down on the West Mainline following a total loss of air. The train pulled a coupling around the 45 car position. 16th June 2018. GeodataJun 24, 2018
180616_1662.jpg
180616 1662366 viewsCooya Pooya, instrumented ore waggon 1024, a Bradken built 'J' waggon with a build date from January 2006. The solar panels are mounted along each side. 16th June, 2018.Jun 24, 2018
180616_1660.jpg
180616 1660328 viewsCooya Pooya, 32 km on the Cape Lambert line, Rio Tinto loco 9108 with serial 62539 a GE Erie built GE model ES44ACi from the 2nd order in Rio Tinto Stripes livery side view, following a total loss of air, the train is tied down while the driver walks the consist. The train pulled a coupling around the 45 car position. 16th June 2018. GeodataJun 24, 2018
180616_1659.jpg
180616 1659345 viewsCooya Pooya, 32 km on the Cape Lambert line, Rio Tinto loco 9103 with serial 61941 a GE Erie built GE model ES44ACi from the 1st order in Rio Tinto Stripes livery side view, following a total loss of air, the locomotive's hose bag is chained to the rail in case of movement. The train pulled a coupling around the 45 car position. 16th June 2018. GeodataJun 24, 2018
180616_1657.jpg
180616 1657356 viewsCooya Pooya, 32 km on the Cape Lambert line, Rio Tinto loco 9103 with serial 61941 a GE Erie built GE model ES44ACi from the 1st order in Rio Tinto Stripes livery is 'tied down' to the mainline following a total loss of air, the locomotive's hose bag can be seen chained to the rail in case of movement. The train pulled a coupling around the 45 car position. 16th June 2018. GeodataJun 24, 2018
180615_1625.jpg
180615 1625321 viewsGoldsworthy Junction, BHP stabled rail or steel train holds the former Goldsworthy mainline between the junction and Node 1 due to upgrading track works within the flash butt yard behind Electro-Motive Diesel built SD70ACe 4360 serial 20098203-005 in late afternoon light. 15th June 2018. GeoData.
Photo by Roland Depth.
Jun 24, 2018
180615_1607.jpg
180615 1607300 viewsWalla Siding, BHP ballast waggon 0207 built from JFE410RW steel by CNR QRRS China. 15th June 2018. Roland Depth image.Jun 24, 2018
180615_1579.jpg
180615 1579269 viewsWalla Siding, BHP took delivery of two new ballast ploughs in December 2017. They were built by CRRC Yangtze China in 2017 and weigh in at 65 tonnes. The ploughs are numbered BP 01 and BP 02. We finally caught up with them top and tail on a ballast consist, here's BP 01.
Roland Depth photo.
Jun 24, 2018
180615_1575.jpg
180615 1575296 viewsWalla Siding, BHP ballast waggon 0226 built from JFE410RW steel by CNR QRRS China. 15th June 2018. Roland Depth image.Jun 24, 2018
180615_1555.jpg
180615 1555274 viewsWalla Siding, BHP Billiton mid-train units 4396 serial 20118575-006 and 4436 serial 20128866-005 both SD70ACe units built by Progress Rail, Muncie USA. 15th June 2018.Jun 24, 2018
180615_1574.jpg
180615 1574300 viewsWalla Siding, BHP took delivery of two new ballast ploughs in December 2017. They were built by CRRC Yangtze China in 2017 and weigh in at 65 tonnes. The ploughs are numbered BP 01 and BP 02. We finally caught up with them top and tail on a ballast consist, here's BP 02.
Roland Depth photo.
Jun 24, 2018
180615_1520.jpg
180615 1520311 viewsWalla Siding, another named Progress Rail built EMD SD70ACe model 4478 'Ivan Butson' serial 20148001-011. 15th June 2018.
Toad Montgomery photo.
Jun 24, 2018
180615_1518.jpg
180615 1518292 viewsWalla Siding, another named Progress Rail built EMD SD70ACe model 4478 'Ivan Butson' serial 20148001-011 leads sister 4467 with a loaded train. 15th June 2018.Jun 24, 2018
180615_1513.jpg
180615 1513305 viewsIndee Station road grade crossing 53.3 km, loaded Roy Hill mid-train units General Electric built ES44ACi model RHA 1014 serial 62586 and sister unit RHA 1004. GeoData. 15th June 2018.Jun 24, 2018
180615_1507.jpg
180615 1507306 viewsIndee Station road grade crossing 53.3 km, loaded Roy Hill train behind General Electric built ES44ACi model RHA 1007 serial 62579 and sister unit RHA 1010 with the mid-train units visible in the distance. GeoData. 15th June 2018.Jun 24, 2018
180615_1496.jpg
180615 1496384 viewsMooka Yard, side view of named BHP's Progress Rail built EMD SD70ACe unit 4486 'Jenny Parkinson' serial 20148001-019. 15th June 2018.
Roland Depth photo.
Jun 24, 2018
180615_1497.jpg
180615 1497326 viewsMooka Yard, cab side of named BHP's Progress Rail built EMD SD70ACe unit 4486 'Jenny Parkinson' serial 20148001-019. 15th June 2018.
Roland Depth photo.
Jun 24, 2018
180615_1411.jpg
180615 1411393 viewsBing Siding, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4432 'Warlu' serial 20128866-001 leads a loaded towards the port. 15th June 2018.Jun 24, 2018
180615_1472.jpg
180615 1472400 viewsBing South, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4455 serial 20138907-006 with 4356 second unit powers along the west mainline with a loaded rake heading for Finucane Island. 15th June 2018.Jun 24, 2018
180615_1407.jpg
180615 1407388 viewsBing Siding, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4432 'Warlu' serial 20128866-001 leads a loaded towards the port. 15th June 2018.Jun 24, 2018
18386 files on 920 page(s) 250

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional