Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
170510_8283.jpg
170510 8283257 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.Nov 03, 2017
170510_8282.jpg
170510 8282276 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.Nov 03, 2017
141124_7092.jpg
141124 7092243 viewsRio Tinto compressor waggon set leader CB 01, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here at 7 Mile, Dampier on 24th November 2014.Nov 03, 2017
141124_7078.jpg
141124 7078252 viewsRio Tinto compressor waggon set leader CB 01, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here at Parker Point, Dampier on 24th November 2014.Nov 03, 2017
131122_3312.jpg
131122 3312273 viewsRio Tinto compressor waggon set CB 08, has been upgraded from the original Robe River compressor waggon set IC 22 with air receiver and IC 23 with two Atlas Copco XAS 97 units replacing the original Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 22nd November 2013.Nov 03, 2017
110602_8648.jpg
110602 8648230 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.Nov 03, 2017
110602_8647.jpg
110602 8647249 viewsRio Tinto compressor waggon set CB 03, receiver waggon with two air tanks or receivers. These are built on former ore waggons that have been cut down. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.Nov 03, 2017
110602_8646.jpg
110602 8646256 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco. Note these waggons are cut down ore waggons. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.Nov 03, 2017
110602_8604.jpg
110602 8604242 viewsRio Tinto compressor waggon set CB 04, compressor control waggon with two diesel powered Atlas Copco XAS 97's and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.Nov 03, 2017
100330_8067.jpg
100330 8067263 viewsRio Tinto compressor waggon set CB 05, receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 30th March 2010.Nov 03, 2017
100330_8066.jpg
100330 8066245 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 30th March 2010.Nov 03, 2017
100329_8041.jpg
100329 8041235 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 29th March 2010.Nov 03, 2017
100329_8039.jpg
100329 8039267 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 29th March 2010.Nov 03, 2017
9006_070909_0655.jpg
9006 070909 0655277 viewsRobe River compressor waggon 9006 on the lead of a Deepdale rake going through the car dumper at Cape Lambert. Fitted with an Atlas Copco XAS 85 compressor, fuel tank and air receiver. This waggon is a modified Tomlinson Steel built ore waggon. September 9, 2007.Nov 03, 2017
IC20_070908_0596.jpg
IC20 070908 0596272 viewsRobe River compressor waggon set IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert yard August 8, 2007.Nov 03, 2017
IC22_070908_0595.jpg
IC22 070908 0595299 viewsRobe River compressor waggon set IC 22 with air receiver and IC 23 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert yard, August 8, 2007.Nov 03, 2017
IC20_070908_0594.jpg
IC20 070908 0594307 viewsRobe River compressor waggon sets IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors and IC 22 with receiver and IC 23 with compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert yard, August 8 2007.Nov 03, 2017
060724_7865.jpg
060724 7865296 viewsOriginal Hamersley Iron compressor waggon set IC-1 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 24th July 2006.Nov 03, 2017
060724_7864.jpg
060724 7864285 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 24th July 2006.Nov 03, 2017
060723_7846.jpg
060723 7846290 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.Nov 03, 2017
18740 files on 937 page(s) 302

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional