Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
229-12.jpg
229-12125 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit, cab side. GeoData.Nov 13, 2015
229-11.jpg
229-11123 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.Nov 13, 2015
229-10.jpg
229-10121 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.Nov 13, 2015
229-09.jpg
229-09119 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit. GeoData.Nov 13, 2015
229-08.jpg
229-08122 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151, cab side. GeoData.Nov 13, 2015
229-07.jpg
229-07122 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout with mid-train remote units Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151 leading sister unit 5657, note the sheet metal windscreen protector plates, grade crossing is the YT 311.5 km. GeoData.Nov 13, 2015
229-06.jpg
229-06133 viewsYandi Two at the 311.5 km with an empty BHP train heading for the loadout behind mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing lead remote sister unit 5660. GeoData.Nov 13, 2015
229-05.jpg
229-05115 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout with mid-train remote units Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151 leading sister unit 5657, grade crossing is the YT 311.5 km. GeoData.Nov 13, 2015
229-04.jpg
229-04148 viewsYandi Two at the 311.5 km with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with second unit 5642 'Wallareenya' serial 8281-07 / 92-131 trailing sister unit 5650. GeoData.Nov 13, 2015
229-03.jpg
229-03318 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with 5650 'Yawata' serial 8412-07 / 93-141 leading sister unit 5642, grade crossing is the YT 311.5 km. GeoData.Nov 13, 2015
229-02.jpg
229-02123 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.Nov 13, 2015
229-01.jpg
229-01124 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.Nov 13, 2015
229-0A.jpg
229-0A123 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.Nov 13, 2015
229-00.jpg
229-00132 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.Nov 13, 2015
228-37.jpg
228-37137 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .Nov 13, 2015
228-36.jpg
228-3698 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .Nov 13, 2015
228-35.jpg
228-35100 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .Nov 13, 2015
228-34.jpg
228-34106 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .Nov 13, 2015
228-33.jpg
228-33102 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .Nov 13, 2015
228-32.jpg
228-3294 viewsYandi Two exit portal or loaded car side of load-out tunnel, stacker tip just visible above stock pile, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is active at a time. Geodata -22.719050, 119.040566 .Nov 13, 2015
16909 files on 846 page(s) 452

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional