Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
130705_0604.jpg
130705 0604147 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0601.jpg
130705 0601165 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0602.jpg
130705 0602164 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0600.jpg
130705 0600181 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0599.jpg
130705 0599172 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0597.jpg
130705 0597161 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0598.jpg
130705 0598172 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0595.jpg
130705 0595153 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0596.jpg
130705 0596150 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0593.jpg
130705 0593152 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0594.jpg
130705 0594155 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0592.jpg
130705 0592167 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0591.jpg
130705 0591175 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0590.jpg
130705 0590173 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0589.jpg
130705 0589155 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0588.jpg
130705 0588175 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0587.jpg
130705 0587167 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0586.jpg
130705 0586151 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.Jan 27, 2015
130705_0585.jpg
130705 0585172 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.Jan 27, 2015
130705_0584.jpg
130705 0584172 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.Jan 27, 2015
16911 files on 846 page(s) 529

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional