Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
227-01.jpg
227-01240 viewsNelson Point, view along A and B berths from Shiploader 2, Shiploader 1 on B berth, reclaimers 3 and 4 visible behind the under harbour tunnel feed conveyor. GeoData.Nov 13, 2015
227-02.jpg
227-02227 viewsNelson Point, view along A and B berths from Shiploader 2, Shiploader 1 on B berth, reclaimers 3 and 4 visible behind the under harbour tunnel feed conveyor. GeoData.Nov 13, 2015
226-37.jpg
226-37258 viewsShaw siding back track, 219 km, a defected waggon has been cut off a loaded Yandi train, waggon 1567 is a Comeng WA build from a batch of 288 built in 1974. GeoData.Nov 13, 2015
226-36.jpg
226-36266 viewsShaw siding 219 km, 5654 'Kashima' serial 8412-11 / 93-145 is the trail or slave remote on the mid-train pair of units, note the large flat fuel tank indicating this unit was a Comeng NSW built ALCo before rebuild. GeoData.Nov 13, 2015
226-35.jpg
226-35269 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the CCTV camera is visible under the radiator wing, this was a trial for single man crewing when operating long end lead, also note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.Nov 13, 2015
226-34.jpg
226-34250 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the vinyl windscreen protectors are fitted to the windscreens, note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.Nov 13, 2015
226-33.jpg
226-33226 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.Nov 13, 2015
226-32.jpg
226-32230 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.Nov 13, 2015
226-31.jpg
226-31225 viewsShaw siding, the loaded train heading north around the 698 metre radius curve behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons. GeoData.Nov 13, 2015
226-30.jpg
226-30216 viewsShaw siding, the loaded train heading north behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons and a couple of the smooth sided experimental Comeng waggons. GeoData.Nov 13, 2015
226-29.jpg
226-29264 viewsShaw siding, the loaded train is winning the climb as second unit 5636 'Munda' serial 8151-11 / 91-122 another Goninan CM40-8M GE rebuild assists in powering the train to port. GeoData.Nov 13, 2015
226-28.jpg
226-28239 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.Nov 13, 2015
226-26.jpg
226-26229 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.Nov 13, 2015
226-27.jpg
226-27216 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.Nov 13, 2015
226-25.jpg
226-25233 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.Nov 13, 2015
226-24.jpg
226-24228 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.Nov 13, 2015
226-23.jpg
226-23234 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.Nov 13, 2015
226-22.jpg
226-22246 viewsShaw siding back track at the 219 km, Speno RR 24 M-1 rail grinder stabled in back track, side view. GeoData.Nov 13, 2015
226-21.jpg
226-21243 viewsShaw siding back track at the 219 km, Speno RR 24 M-1 rail grinder stabled in back track. GeoData.Nov 13, 2015
226-20.jpg
226-20231 viewsShaw North, 216.5 km, all the departure signals in a row looking across the cutting. SWN 4R, SWN 4, SWN 6 and SWN 6R for north bound movements. GeoData.Nov 13, 2015
18442 files on 923 page(s) 533

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional