Last additions |

227-01240 viewsNelson Point, view along A and B berths from Shiploader 2, Shiploader 1 on B berth, reclaimers 3 and 4 visible behind the under harbour tunnel feed conveyor. GeoData.Nov 13, 2015
|
|

227-02227 viewsNelson Point, view along A and B berths from Shiploader 2, Shiploader 1 on B berth, reclaimers 3 and 4 visible behind the under harbour tunnel feed conveyor. GeoData.Nov 13, 2015
|
|

226-37258 viewsShaw siding back track, 219 km, a defected waggon has been cut off a loaded Yandi train, waggon 1567 is a Comeng WA build from a batch of 288 built in 1974. GeoData.Nov 13, 2015
|
|

226-36266 viewsShaw siding 219 km, 5654 'Kashima' serial 8412-11 / 93-145 is the trail or slave remote on the mid-train pair of units, note the large flat fuel tank indicating this unit was a Comeng NSW built ALCo before rebuild. GeoData.Nov 13, 2015
|
|

226-35269 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the CCTV camera is visible under the radiator wing, this was a trial for single man crewing when operating long end lead, also note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.Nov 13, 2015
|
|

226-34250 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the vinyl windscreen protectors are fitted to the windscreens, note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.Nov 13, 2015
|
|

226-33226 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.Nov 13, 2015
|
|

226-32230 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.Nov 13, 2015
|
|

226-31225 viewsShaw siding, the loaded train heading north around the 698 metre radius curve behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons. GeoData.Nov 13, 2015
|
|

226-30216 viewsShaw siding, the loaded train heading north behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons and a couple of the smooth sided experimental Comeng waggons. GeoData.Nov 13, 2015
|
|

226-29264 viewsShaw siding, the loaded train is winning the climb as second unit 5636 'Munda' serial 8151-11 / 91-122 another Goninan CM40-8M GE rebuild assists in powering the train to port. GeoData.Nov 13, 2015
|
|

226-28239 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.Nov 13, 2015
|
|

226-26229 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.Nov 13, 2015
|
|

226-27216 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.Nov 13, 2015
|
|

226-25233 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.Nov 13, 2015
|
|

226-24228 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.Nov 13, 2015
|
|

226-23234 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.Nov 13, 2015
|
|

226-22246 viewsShaw siding back track at the 219 km, Speno RR 24 M-1 rail grinder stabled in back track, side view. GeoData.Nov 13, 2015
|
|

226-21243 viewsShaw siding back track at the 219 km, Speno RR 24 M-1 rail grinder stabled in back track. GeoData.Nov 13, 2015
|
|

226-20231 viewsShaw North, 216.5 km, all the departure signals in a row looking across the cutting. SWN 4R, SWN 4, SWN 6 and SWN 6R for north bound movements. GeoData.Nov 13, 2015
|
|
18442 files on 923 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
533 |  |
 |
 |
 |
 |
 |
 |
|