Last additions |

130704 049892 viewsMoule, view of the General Railway Signal Company point lever and indicator at the western end of the crossing loop. Location here, 4th July 2013.Jan 27, 2015
|
|

130704 049795 viewsMoule, view of the General Railway Signal Company point lever and indicator at the western end of the crossing loop. Location here, 4th July 2013.Jan 27, 2015
|
|

130704 049687 viewsMoule, yard view looking east from the western end of the loop towards the 446 km, crossing loop on the left, heavy track wear is evident. Location here, 4th July 2013.Jan 27, 2015
|
|

130704 049583 viewsMoule, looking west towards Charra and Kevin at the 446 km, with the crossing loop on the right. Location here, 4th July 2013.Jan 27, 2015
|
|

130704 049487 viewsMoule, looking west towards Charra and Kevin along the roller coaster grades with the crossing loop on the right and the points for the ballast siding just behind the camera. Location here, 4th July 2013.Jan 27, 2015
|
|

130704 049389 viewsMoule, yard view looking east from the points for the single ended ballast siding with ballast pile of the left. Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 049288 viewsMoule, yard view looking east from the points for the single ended ballast siding with ballast pile of the left. Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 0491111 viewsMoule, Mallee style shelter shed as a station 'building' of sorts. Moule was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 048987 viewsMoule, yard overview looking west, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the Mallee style shelter shed, mainline, crossing loop and ballast siding. Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 048889 viewsMoule, yard overview looking east, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the end of the ballast siding with the crossing loop rejoining the mainline just before the grade crossing to access the ballast stockpile area. Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 048787 viewsMoule, looking east, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the end of the ballast siding with the crossing loop rejoining the mainline just before the grade crossing to access the ballast stockpile area. Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 048692 viewsMoule, Mallee style shelter shed as a station 'building' of sorts. Moule was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 048591 viewsKyancutta, the rear of a south bound loaded grain as it departs with the final four waggons all HCN type bogie grain hoppers converted by SAR Islington Workshops from Tulloch Ltd NSW built NHB type hopper waggons. 4th July 2013.Jan 27, 2015
|
|

130704 048493 viewsKyancutta, the rear of a south bound loaded grain as it departs with the final five waggons all HCN type bogie grain hoppers converted by SAR Islington Workshops from Tulloch Ltd NSW built NHB type hopper waggons as they cross the Eyre Highway grade crossing and one of the three electric searchlight signals on the network. 4th July 2013.Jan 27, 2015
|
|

130704 048388 viewsKyancutta, the rear of a south bound loaded grain as it departs with the final five waggons all HCN type bogie grain hoppers converted by SAR Islington Workshops from Tulloch Ltd NSW built NHB type hopper waggons as they cross the Eyre Highway grade crossing and one of the three electric searchlight signals on the network. 4th July 2013.Jan 27, 2015
|
|

130704 048292 viewsKyancutta, HCN type bogie grain hopper waggon HCN 40, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.Jan 27, 2015
|
|

130704 048188 viewsKyancutta, HCN type bogie grain hopper waggon HCN 3, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.Jan 27, 2015
|
|

130704 048096 viewsKyancutta, HCN type bogie grain hopper waggon HCN 21, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.Jan 27, 2015
|
|

130704 0479108 viewsKyancutta, HCN type bogie grain hopper waggon HCN 35, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.Jan 27, 2015
|
|

130704 047893 viewsKyancutta, HCN type bogie grain hopper waggon HCN 8, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.Jan 27, 2015
|
|
16909 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
534 |  |
 |
 |
 |
 |
 |
 |
|