Last additions |

060111 230891 viewsKopi, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.Jan 27, 2015
|
|

060111 230588 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.Jan 27, 2015
|
|

060111 230692 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.Jan 27, 2015
|
|

060111 230485 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.Jan 27, 2015
|
|

060111 230398 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.Jan 27, 2015
|
|

060111 2302104 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo as they pass the 147 km post. 11th January 2006.Jan 27, 2015
|
|

060111 230189 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|

060111 230094 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|

060111 2299101 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|

060111 2298105 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|

060111 2297133 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|

060111 2296129 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|

060111 2295231 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|

060111 2294127 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|

060111 2293130 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.Jan 27, 2015
|
|

060111 229299 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.Jan 27, 2015
|
|

060111 2291105 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.Jan 27, 2015
|
|

060111 229099 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.Jan 27, 2015
|
|

060111 228989 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.Jan 27, 2015
|
|

060111 228892 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.Jan 27, 2015
|
|
16909 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
562 |  |
 |
 |
 |
 |
 |
 |
|