Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
130705_0554.jpg
130705 0554232 viewsLock, HAN type bogie grain hopper waggon HAN 60, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system. 5th July 2013.Jan 27, 2015
130705_0553.jpg
130705 0553210 viewsLock, HBN type dual use ballast / grain hopper waggons, HBN 5. One of seventeen built by South Australian Railways Islington Workshops in 1968 with a 25 ton capacity, increased to 34 tons in 1974. HBN 1-11 fitted with removable tops and roll-top hatches in 1999-2000. 5th July 2013.Jan 27, 2015
130705_0552.jpg
130705 0552194 viewsLock, HCN type bogie grain hopper waggon HCN 39, originally an NHB type hopper NHB 1573 built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Fitted with a Moose Metalworks roll-top cover. 5th July 2013.Jan 27, 2015
130705_0551.jpg
130705 0551219 viewsLock, HCN type bogie grain hopper waggon HCN 39, originally an NHB type hopper NHB 1573 built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Fitted with a Moose Metalworks roll-top cover. 5th July 2013.Jan 27, 2015
130705_0550.jpg
130705 0550225 viewsLock, Genesee & Wyoming 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.Jan 27, 2015
130705_0549.jpg
130705 0549211 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0548.jpg
130705 0548195 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0547.jpg
130705 0547193 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0546.jpg
130705 0546208 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0545.jpg
130705 0545197 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0544.jpg
130705 0544232 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0542.jpg
130705 0542195 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0543.jpg
130705 0543195 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0541.jpg
130705 0541199 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0540.jpg
130705 0540225 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0539.jpg
130705 0539202 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0538.jpg
130705 0538207 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0537.jpg
130705 0537208 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0536.jpg
130705 0536215 viewsLock, side view of Genesee & Wyoming 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004.Jan 27, 2015
130705_0535.jpg
130705 0535210 viewsLock, cab view through windows of former Australian National narrow gauge 830 class locomotive 846, an AE Goodwin built ALCo DL531 model with serial 84715 built new for the SAR in 1963 and delivered to Adelaide Division on broad gauge, transferred to Tasmania on narrow gauge in 1982, then back to SA on standard gauge in 1989 and then Whyalla in 2008 on narrow gauge. In 2012 is was delivered to Port Lincoln, the last loco delivered to the Eyre Peninsula. 5th July 2013.Jan 27, 2015
18442 files on 923 page(s) 608

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional