Last additions |

130705 0514273 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
|
|

130705 0513262 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
|
|

130705 0512255 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
|
|

130705 0511282 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
|
|

130705 0510282 viewsLock, the heavy fog has lifted and EMD 1200 class unit 1203 is leading the loading of a grain train on the grain loop road with two ALCo DL531 units 846 and 859.Jan 27, 2015
|
|

130704 0506278 viewsMoule, view of the massive silo complex of Thevenard in the distance across the water, they are approximately 13 km away, location here. 4th July 2013.Jan 27, 2015
|
|

130704 0505218 viewsMoule, view looking east from the eastern end of the crossing loop with the point lever and indicator. The small 30 sign is the speed limit, the grade crossing is to access the ballast stockpile area. 4th July 2013.Jan 27, 2015
|
|

130704 0504225 viewsMoule, Trak-Lok M7.5 steel sleeper for 31 kg/m rail manufactured by BHP in 1996, the 7.5 is the thickness in millimetres of the steel used. 4th July 2013.Jan 27, 2015
|
|

130704 0503222 viewsMoule, yard overview looking west from the east end points of the crossing loop, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left point lever and indicator, the crossing loop on the right and then the ballast pile in the distance. Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 0502203 viewsMoule, view of the point lever and indicator with the massive silo complex of Thevenard in the distance across the water, they are approximately 13 km away, location here. 4th July 2013.Jan 27, 2015
|
|

130704 0501222 viewsMoule, view of the point lever and indicator with the massive silo complex of Thevenard in the distance across the water, they are approximately 13 km away, location here. 4th July 2013.Jan 27, 2015
|
|

130704 0500219 viewsMoule, looking east at the east end points for the crossing loop, grade crossing is for access to ballast stockpile area, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 0499234 viewsMoule, looking east, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the end of the ballast siding with the crossing loop rejoining the mainline just before the grade crossing to access the ballast stockpile area. Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 0498219 viewsMoule, view of the General Railway Signal Company point lever and indicator at the western end of the crossing loop. Location here, 4th July 2013.Jan 27, 2015
|
|

130704 0497215 viewsMoule, view of the General Railway Signal Company point lever and indicator at the western end of the crossing loop. Location here, 4th July 2013.Jan 27, 2015
|
|

130704 0496202 viewsMoule, yard view looking east from the western end of the loop towards the 446 km, crossing loop on the left, heavy track wear is evident. Location here, 4th July 2013.Jan 27, 2015
|
|

130704 0495213 viewsMoule, looking west towards Charra and Kevin at the 446 km, with the crossing loop on the right. Location here, 4th July 2013.Jan 27, 2015
|
|

130704 0494204 viewsMoule, looking west towards Charra and Kevin along the roller coaster grades with the crossing loop on the right and the points for the ballast siding just behind the camera. Location here, 4th July 2013.Jan 27, 2015
|
|

130704 0493231 viewsMoule, yard view looking east from the points for the single ended ballast siding with ballast pile of the left. Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 0492228 viewsMoule, yard view looking east from the points for the single ended ballast siding with ballast pile of the left. Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.Jan 27, 2015
|
|
18442 files on 923 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
610 |  |
 |
 |
 |
 |
 |
 |
|