|  Last additions | 
        
        | 
                        
                                |  100729 01491324 viewsWO type iron ore waggon WO 31295 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 174 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, empty train 29th July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.Jan 27, 2015
 |  | 
                        
                                |  100729 01490372 viewsWOB type iron ore waggon WOB 31400 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 324 for Koolyanobbing iron ore operations. This waggon was also converted to a WSM type ballast hopper by re-fitting the cut down top section and having bottom discharge doors fitted, converted back to WOB in 1998, on a loaded train at Binduli, 29th July 2010.Jan 27, 2015
 |  | 
                        
                                |  100729 01489340 viewsWOD type iron ore waggon WOD 31456 is one of a batch of sixty two built by Goninan WA between April and August 2000 with serial number 950086-028 and fleet number 519 for Koolyanobbing iron ore operations with a 75 ton capacity for Portman Mining to cart their Koolyanobbing iron ore to Esperance, PORTMAN has been painted out, Binduli, 29th July 2010.Jan 27, 2015
 |  | 
                        
                                |  100729 01488364 viewsWOB type iron ore waggon WOB 31391 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 316 for Koolyanobbing iron ore operations. This waggon was also converted to a WSM type ballast hopper by re-fitting the cut down top section and having bottom discharge doors fitted, converted back to WOB in 1998, returning empty to Koolyanobbing at Binduli, 29th July 2010.Jan 27, 2015
 |  | 
        
        | 
                        
                                |  100729 01487329 viewsWOE type iron ore waggon WOE 33526 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-066 and fleet number 9014 for Koolyanobbing iron ore operations, Binduli 29th July 2010.Jan 27, 2015
 |  | 
                        
                                |  100729 01486313 viewsWOE type iron ore waggon WOE 33502 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-042 and fleet number 8994 for Koolyanobbing iron ore operations, with ARG decal, build date of 10/2008 and revised load of 82.5 tonnes, Binduli 29th July 2010.Jan 27, 2015
 |  | 
                        
                                |  100729 01485331 viewsWOE type iron ore waggon WOE 33307 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-012 and fleet number 806 for Koolyanobbing iron ore operations with the revised down load of 82.5 tonnes, in a loaded train at Binduli 27th July 2010.Jan 27, 2015
 |  | 
                        
                                |  100605 9378318 viewsWOA type iron ore waggon WOA 31326 is one of a batch of thirty nine built by WAGR Midland Workshops between 1970 and 1971 with fleet number 211 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, loaded with fines, 5th June 2010.Jan 27, 2015
 |  | 
        
        | 
                        
                                |  100605 9377346 viewsWO type iron ore waggon WO 31404 is one of a batch of eleven replacement waggons built by WAGR Midland Workshops between 1970 and 1971 with fleet number 182 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, loaded with fines, 5th June 2010.Jan 27, 2015
 |  | 
                        
                                |  100605 9376309 viewsWO type iron ore waggon WO 31274 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 156 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, loaded with fines, 5th June 2010.Jan 27, 2015
 |  | 
                        
                                |  100605 9375310 viewsWOA type iron ore waggon WOA 31308 is one of a batch of thirty nine built by WAGR Midland Workshops between 1970 and 1971 with fleet number for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, loaded with fines, 5th June 2010.Jan 27, 2015
 |  | 
                        
                                |  100605 9374331 viewsWOD type iron ore waggon WOD 31324 is one of a batch of sixty two built by Goninan WA between April and August 2000 with serial number 950086-012 and fleet number 502 for Koolyanobbing iron ore operations with a 75 ton capacity and a replacement for a WO type waggon number, for Portman Mining to cart their Koolyanobbing iron ore to Esperance, Binduli Triangle, loaded with fines, 5th June 2010.Jan 27, 2015
 |  | 
        
        | 
                        
                                |  100605 9373316 viewsWO type iron ore waggon WO 31278 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 158 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, loaded with fines, 5th June 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.Jan 27, 2015
 |  | 
                        
                                |  100605 9372305 viewsWOA type iron ore waggon WOA 31315 is one of a batch of thirty nine built by WAGR Midland Workshops between 1970 and 1971 with fleet number 208 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, loaded with fines, 5th June 2010.Jan 27, 2015
 |  | 
                        
                                |  100605 9371331 viewsWO type iron ore waggon WO 31281 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 161 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, loaded with fines, 5th June 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.Jan 27, 2015
 |  | 
                        
                                |  100605 9370397 viewsWO type iron ore waggon WO 31294 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, loaded with fines, 5th June 2010.Jan 27, 2015
 |  | 
        
        | 
                        
                                |  100605 9369304 viewsWOD type iron ore waggon WOD 31471 is one of a batch of sixty two built by Goninan WA between April and August 2000 with serial number 950086-043 and fleet number 534 for Koolyanobbing iron ore operations with a 75 ton capacity for Portman Mining to cart their Koolyanobbing iron ore to Esperance, now with PORTMAN painted out, Binduli Triangle, loaded with fines, 5th June 2010.Jan 27, 2015
 |  | 
                        
                                |  100605 9368300 viewsWOC type iron ore waggon WOC 31357 is one of a batch of thirty built by Goninan WA between October 1997 to January 1998 with fleet number 417 for Koolyanobbing iron ore operations with a 75 ton capacity and lettered for KIPL, Koolyanobbing Iron Pty Ltd with only the K left, Binduli Triangle loaded with fines, 5th June 2010.Jan 27, 2015
 |  | 
                        
                                |  100605 9367303 viewsWO type iron ore waggon WO 31243 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 134 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, loaded with fines, 5th June 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.Jan 27, 2015
 |  | 
                        
                                |  100605 9366303 viewsWO type iron ore waggon WO 31232 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 124 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle, loaded with fines, 5th June 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.Jan 27, 2015
 |  | 
        
                | 
                                
                                       | 19085 files on 955 page(s) |  |  |  |  |  |  |  |  | 745 |  |  |  |  |  |  |  |  |