Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
123-2-25.jpg
123-2-25279 viewsSunshine V/Line Tulloch built DRC class railmotor and MTH class trailer with an up passenger service.Apr 29, 2014
123-2-24.jpg
123-2-24275 viewsSunshine track view, Newport - Sunshine Loop Line, looking towards Newport, GEB Sidings on the right, semaphore signal post 50 protecting down movements, V/Line broad gauge G class G 543, the last unit of Clyde Engineering EMD model JT26C-2SS serial 89-1276 with an loaded up Apex quarry train bound for Brooklyn, trailing shot.Apr 29, 2014
123-2-23.jpg
123-2-23283 viewsSunshine track view, Newport - Sunshine Loop Line, looking towards Newport, GEB Sidings on the right, V/Line broad gauge G class G 543, the last unit of Clyde Engineering EMD model JT26C-2SS serial 89-1276 with loaded up Apex quarry train bound for Brooklyn, trailing shot.Apr 29, 2014
123-2-22.jpg
123-2-22321 viewsSunshine track view, Newport - Sunshine Loop Line, looking towards Sunshine, double doll semaphore signal posts 36 and pulled off semaphore signal post 49 sort of frame V/Line broad gauge G class G 543, the last member of the class, Clyde Engineering EMD model JT26C-2SS serial 89-1276 with loaded up Apex quarry train bound for Brooklyn.Apr 29, 2014
123-2-21.jpg
123-2-21272 viewsSunshine track view, Newport - Sunshine Loop Line, looking towards Sunshine, double doll semaphore signal posts 36 and pulled off semaphore signal post 49, G class arriving with an up Brooklyn bound Apex quarry train.Apr 29, 2014
123-2-20.jpg
123-2-20298 viewsSunshine track view, Newport - Sunshine Loop Line, looking towards Sunshine, double doll semaphore signal posts 36 and pulled off semaphore signal post 49, G class arriving with an up Brooklyn bound Apex quarry train.Apr 29, 2014
123-2-19.jpg
123-2-19306 viewsSunshine V/Line broad gauge up passenger train with P class P 14 Clyde Engineering EMD model G18HBR serial 84-1208 rebuilt from First Series T class T 330 Clyde Engineering EMD model G8B serial 56-85, and H set, searchlight signal gantry on the right is for the standard gauge Sunshine Loop. Semaphore signal post 49 is pulled off for an up train on the Newport - Sunshine Loop Line on the left.Apr 29, 2014
123-2-18.jpg
123-2-18322 viewsSunshine V/Line broad gauge down passenger train with Victorian Railways liveried B class B 75 Clyde Engineering EMD model ML2 serial ML2-16, power van and N set.Apr 29, 2014
123-2-17.jpg
123-2-17330 viewsSunshine V/Line broad gauge down passenger train with N class N 461 'City of Ararat' Clyde Engineering EMD model JT22HC-2 serial 86-1190 and N set.Apr 29, 2014
123-2-15.jpg
123-2-15314 viewsSunshine V/Line broad gauge P class P 11 Clyde Engineering EMD model G18HBR serial 84-1205 rebuilt from First Series T class T 336 Clyde Engineering EMD model G8B serial 56-110, H set, down pass.Apr 29, 2014
123-2-16.jpg
123-2-16321 viewsSunshine broad gauge up passenger train with V/Line N class loco N 456 'City of Colac' with serial 85-1224 a Clyde Engineering Somerton Victoria built EMD model JT22HC-2 with D vans and N set.Apr 29, 2014
123-2-14.jpg
123-2-14342 viewsMaffra station yard view, looking towards Stratford, station platform.Apr 29, 2014
123-2-13.jpg
123-2-13331 viewsMaffra yard overview, Sidings A, looking at Milk Co-op buildings, Maffra station platform to left of frame.Apr 29, 2014
123-2-12.jpg
123-2-12338 viewsMaffra, brick Milk Co-op building with rail connection and rail loading platform, Sidings A.Apr 29, 2014
123-2-11.jpg
123-2-11332 viewsMaffra, brick Milk Co-op building with rail connection, Sidings A.Apr 29, 2014
123-2-10.jpg
123-2-10307 viewsMaffra yard overview, Sidings A, Milk Co-op buildings.Apr 29, 2014
123-2-09.jpg
123-2-09351 viewsMaffra station building, rear view.Apr 29, 2014
123-2-07.jpg
123-2-07344 viewsMaffra station overview, looking from Tinamba end of yard, broad gauge V/Line RT class rail tractor RT 49 started out as I waggon 7507 built by Victorian Railways 21-02-1905, converted to IA in 1936, then K 85 in April 1955 and in 1969 to the underframe of RT 49 by Ballarat North Workshops, Siding A sheds at right of frame, yard overgrown, motor grader, station building.Apr 29, 2014
123-2-08.jpg
123-2-08341 viewsMaffra yard overview, looking towards brick sheds, Sidings A, Milk Co-Op buildings.Apr 29, 2014
123-2-05.jpg
123-2-05365 viewsMaffra station yard overview, looking from Tinamba, points and lever, rail tractor in the background, station building further on, factories on the right.Apr 29, 2014
16913 files on 846 page(s) 794

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional