Last additions |
256-1310 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|
256-1211 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|
256-1111 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|
256-107 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|
256-0911 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|
256-0814 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|
256-0711 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.Nov 20, 2021
|
|
256-0611 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.Nov 20, 2021
|
|
256-0510 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.Nov 20, 2021
|
|
256-0413 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|
256-039 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|
256-029 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|
256-0113 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|
WTT Combined Regions General-Instructions 1986-11-11 109 viewsGeneral Instructions for the Combined Regions working timetable 11th November 1986.
Complete 154 pages, 15.5 MB download.Sep 25, 2021
|
|
WTT Combined Regions 1987-10-11 78 viewsCombined Regions working timetable 11th October 1987.
Complete 123 pages, 13 MB download.Sep 24, 2021
|
|
WTT Addenda MET-Trains 1997-02-1769 viewsMET Trains Working Timetable Addenda 17th February 1997.
Complete 96 pages, 13.1 MB download.Sep 24, 2021
|
|
WTT Mildura Diesel 1953 16-5367 viewsInauguration of Diesel-Electric Operation of Melbourne - Mildura
Monday 16th March 1953.
18 pages PDF download 9.7 MB.Sep 19, 2021
|
|
255-378 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line joining the East Mainline, the mileage is 76.3 km on the Robe and 78.4 on the HI. The interconnecting line branches off the Robe River Cape Lambert to Deepdale line at the 71.1 km. Geodata location here. May 2002.Sep 12, 2021
|
|
255-3613 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line on the left joining the HI Tom Price line. Train Control board for crews to change channels. May 2002.Sep 12, 2021
|
|
255-3511 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line on the left joining the HI Tom Price line. Train Control board for crews to change channels. May 2002.Sep 12, 2021
|
|
16180 files on 809 page(s) |
|
|
|
|
|
|
|
|
81 | |
|
|
|
|
|
|
|