Last additions |

103-12493 viewsRutherglen, portable station building, staff hut, front view.Aug 12, 1990
|
|

103-11508 viewsRutherglen, remains of gangers hut, not turntable pivot in middle of broad gauge rails.Aug 12, 1990
|
|

103-10503 viewsSpringhurst station yard view looking north, mainline points on No.2 Rd for the Wahgunyah line have been spiked and clipped normal, standard gauge flyover on right, yard being rationalised, note redundant disc signal post 5 on ground.Aug 12, 1990
|
|

103-09495 viewsSpringhurst, semaphore signal post 4 with the top of the dolls cut off and the signal for the Wahgunyah line, standard gauge flyover on bank, point rodding, looking south from No.2 Rd.Aug 12, 1990
|
|

103-08478 viewsSpringhurst station yard view, staff exchange platform, elevation from access stairs, platform on the left and silo complex on the right, between No.2 and 3 Roads.Aug 12, 1990
|
|

103-07471 viewsSpringhurst V/Line broad gauge Plasser 07-16B Production Tamper or track tamper with V/Line asset number 6-52-013, an unidentified ballast regulator and a Tamper CSC-2 crib and shoulder compactor with V/Line asset number 6-57-008, track machines.Aug 12, 1990
|
|

103-06499 viewsSpringhurst V/Line broad gauge Plasser 07-16B Production Tamper or track tamper with V/Line asset number 6-52-013.Aug 12, 1990
|
|

103-05485 viewsSpringhurst station building overview, staff exchange platform and walkway across tracks, apparatus set up gauge, signal levers visible in windows, staff exchange box on station wall.Aug 12, 1990
|
|

103-04504 viewsSpringhurst station building overview, staff exchange platform and walkway across tracks, apparatus set up gauge, signal levers visible in windows, staff exchange box on station wall.Aug 12, 1990
|
|

103-03491 viewsSpringhurst station building overview, staff exchange platform and walkway across tracks, apparatus set up gauge laying on No.3 Rd.Aug 12, 1990
|
|

103-01485 viewsSpringhurst automatic staff exchanger cover in-between broad gauge running lines, point rodding under tracks.Aug 12, 1990
|
|

103-02490 viewsSpringhurst yard view, staff exchange platform, auto exchanger cover, point rodding, tamper, silo complex and bunker, loading platform.Aug 12, 1990
|
|

102-23493 viewsRed Cliffs station and yard overview looking south.Jun 09, 1990
|
|

102-18479 viewsHattah Lakes view of lake.Jun 09, 1990
|
|

102-16544 viewsDumosa station, view of the horizontal grain bunker.Jun 09, 1990
|
|

102-15520 viewsSpeed station platform access, annex silo for Geelong style complex.Jun 09, 1990
|
|

102-14521 viewsSpeed, Geelong style with annex and Ascom style silo complexes, overview track side, looking north.Jun 09, 1990
|
|

102-13538 viewsSpeed station yard overview, platform, building removed, radio repeater in distant background.Jun 09, 1990
|
|

102-12519 viewsSpeed radio repeater site.Jun 09, 1990
|
|

102-11557 viewsGama, Geelong style and Ascom silo complex with horizontal grain bunker, overview, track side.Jun 09, 1990
|
|
17610 files on 881 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
880 |
|