Last additions - Pilbara negative and digital Albums - Iron Ore |
233-0763 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.Mar 21, 2016
|
|
233-0863 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.Mar 21, 2016
|
|
233-0564 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.Mar 21, 2016
|
|
233-0660 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.Mar 21, 2016
|
|
233-0461 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.Mar 21, 2016
|
|
233-0360 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.Mar 21, 2016
|
|
233-0262 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.Mar 21, 2016
|
|
233-0170 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. GeoData.Mar 21, 2016
|
|
232-37304 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.Mar 21, 2016
|
|
232-36145 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.Mar 21, 2016
|
|
232-3594 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.Mar 21, 2016
|
|
232-34105 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.Mar 21, 2016
|
|
232-33107 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.Mar 21, 2016
|
|
232-3296 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.Mar 21, 2016
|
|
232-3063 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.Mar 21, 2016
|
|
232-3162 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.Mar 21, 2016
|
|
232-2972 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 leads a LocoTrol remote unit built with no cab, a CM40-8ML 5665. 18th of February 1997. GeoData.Mar 21, 2016
|
|
232-2858 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.Mar 21, 2016
|
|
232-2759 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.Mar 21, 2016
|
|
232-26137 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggon 2502 is a standard Comeng WA build from the third batch of 180 waggons built in 1970. Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 leads a LocoTrol remote unit built with no cab, a CM40-8ML 5665. 18th of February 1997. GeoData.Mar 21, 2016
|
|
3610 files on 181 page(s) |
|
|
|
|
|
|
|
|
137 | |
|
|
|
|
|
|
|