Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Last additions - Pilbara negative and digital Albums - Iron Ore
224-12.jpg
224-12202 viewsBing siding, the extent of the General Electric AC6000 radiators is evident in this back to back image of a pair of units.Oct 27, 2015
224-11.jpg
224-11192 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, shows new nameplate, steerable bogie and taper in cab side, second unit behind sister loco 6076. GeoData.Oct 27, 2015
224-10.jpg
224-10196 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.Oct 27, 2015
224-09.jpg
224-09192 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.Oct 27, 2015
224-08.jpg
224-08188 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.Oct 27, 2015
224-07.jpg
224-07208 viewsBing siding, 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south. GeoData.Oct 27, 2015
224-06.jpg
224-06206 viewsBing siding, 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south. GeoData.Oct 27, 2015
224-05.jpg
224-05214 viewsBing siding, the extent of the General Electric AC6000 radiators is evident in this back to back image of a pair of units.Oct 27, 2015
224-03.jpg
224-03203 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south. GeoData.Oct 27, 2015
224-04.jpg
224-04220 viewsBing siding, the extent of the General Electric AC6000 radiators is evident in this back to back image of a pair of units.Oct 27, 2015
224-02.jpg
224-02211 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073. GeoData.Oct 27, 2015
224-01.jpg
224-01217 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073. GeoData.Oct 27, 2015
222-37.jpg
222-37186 viewsLoaded Hamersley Iron Comeng NSW built ore waggon 562, one of a batch of 150 built in 1968.Oct 26, 2015
222-36.jpg
222-36151 viewsSomewhere on the original single line section between Gull and Rosella a pair of Hamersley Iron General Electric Dash 9-44CW's built by GE at Erie power a loaded train towards Dampier from the passing track back onto the mainline following a crew change.Oct 26, 2015
222-35.jpg
222-35171 viewsSomewhere on the original single line section between Gull and Rosella a pair of Hamersley Iron General Electric Dash 9-44CW's built by GE at Erie power a loaded train towards Dampier from the passing track back onto the mainline following a crew change.Oct 26, 2015
222-34.jpg
222-34153 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7071 serial 47750 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train away from the passing track back onto the mainline following a crew change with second unit 7066 serial 47745.Oct 26, 2015
222-33.jpg
222-33158 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7071 serial 47750 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train away from the passing track back onto the mainline following a crew change with second unit 7066.Oct 26, 2015
222-32.jpg
222-32178 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7071 serial 47750 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train away from the passing track back onto the mainline following a crew change with second unit 7066.Oct 26, 2015
222-31.jpg
222-31168 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7071 serial 47750 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train away from the passing track back onto the mainline following a crew change with second unit 7066.Oct 26, 2015
222-29.jpg
222-29155 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie powers away with an empty train with 7091 following a crew change with a loaded train.Oct 26, 2015
4019 files on 201 page(s) 184

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional